Es el objeto del contrato adjudicar el contrato de arrendamiento de la nave nº 2, integrante del vivero de empresas, bien patrimonial del Ayuntamiento de Guarromán, situado en el Polígono Industrial los Llanos
Servicios de arrendamiento de bienes raíces propios · Private · Jaén · Lasts 36 months
Should I bid?
To bid you need…
- Submit your bid on the contracting body's platform before 28/12/2026.
- Prove the solvency the notice asks for (further down, under “What they ask for”).
What an experienced bidder checks before preparing a bid, with the data behind each point. The decision is yours.
- In favour: 32 days left: there is time.
- 100 % of the points are decided by figures (the price is worth 32 out of 256).
- In 859 similar contracts, usually 1 bid is submitted and the winner barely lowers the price when there are three bids or more.
- In favour: In 86 % of them there was only one bid: competition is usually low.
- If you win, you have 10 working days to hand in the documents that prove what you declared (art. 150.2 LCSP) and to lodge a performance guarantee of 100 % (up to 3.805 €).
Award criteria
- Experiencia del equipo: Experiencia técnica + experiencia de gestión (preferentemente ha emprendido antes) · 5,0 points · by formula
- Grado de definición de proyecciones económicas: No hay proyecciones ni datos · 2,0 points · by formula
- Vecinos de Guarromán: en caso de contratar a vecinos/as de Guarromán · 3,0 points · by formula
- Riesgo asumido: El proyecto es su vida y han asumido riesgos profesionales y/o financieros relevantes. Aportaciones personales y financiación privada al 50% · 5,0 points · by formula
- Producto: La ventaja competitiva aporta un cierto valor a la compañía, pero limitado espacial o temporalmente. · 4,0 points · by formula
- Riesgo asumido: han asumido ciertos riesgos. Aportación económica inferior al 25%. El resto es financiación pública · 3,0 points · by formula
- Complementaridad del equipo: Varios emprendedores con perfiles similares. Liderazgo definido · 4,0 points · by formula
- Experiencia del equipo: Con experiencia acorde al objeto de la ermpresa, pero sin experiencia en la gestión de la empresa/idea · 4,0 points · by formula
- Mercado: Identificado, de ámbito internacional con facturación de más de 500.000 euros. · 5,0 points · by formula
- Formación del equipo: con formación acorde al objeto de la empresa pero sin experiencia en la gestión de la empresa/idea · 4,0 points · by formula
- Producto: Existen ventajas competitivas creíbles y sostenibles en el tiempo. Salto tecnológico. Patente registrada · 5,0 points · by formula
- Cliente: Mercado segmentado, pero no definido · 3,0 points · by formula
- Canal: Segmentado pero no definido · 3,0 points · by formula
- Canal: Realizando los primeros acuerdos · 4,0 points · by formula
- Experiencia del equipo: Con experiencia pero no acorde al objeto de la empre/idea · 3,0 points · by formula
- Grado de definición de proyecciones económicas: Totalmente definidas e identificadas las previsiones del balance y cuenta de pérdidas y ganancias provisionales basadas en fuentes de datos fiables y cr · 10,0 points · by formula
- Cliente: Cliente identificados con nombre y apellidos · 5,0 points · by formula
- Otros colectivos desfavorecidos: victimas de actos terroristas, personas con cargas familiares, personas sin prestación · 1,0 points · by formula
- Mujeres promotoras · 1,0 points · by formula
- Generación de empleo: Creación de más de 10 empleos · 7,0 points · by formula
- Formación del equipo: Con formación pero no acorde al objeto de la empresa "idea" · 3,0 points · by formula
- Edad: menor de 30 y mayor de 45 · 1,0 points · by formula
- Complementaridad del equipo: Varios emprendedores. Liderazgo y responsabilidades definidas · 5,0 points · by formula
- Grado de definición de proyecciones económicas: Definidos el balance y la cuenta de pérdidas y ganancias provisionales basadas en datos estimativos de la empresa correctamente justificados. En caso de · 8,0 points · by formula
- Capacidad de internacionalización: Operaciones recurrentes / activas · 6,0 points · by formula
Solvency required
- El licitador deberá aportar acreditación de la existencia de seguro de responsabilidad civil o declaración jurada comprometiéndose a la contratación del mismo antes de la adjudicación del contrato en caso de ser propuesto.
- Cumplimiento con las obligaciones tributarias
- Capacidad de obrar
- Cumplimiento con las obligaciones con la Seguridad Social
- No prohibición para contratar
The notice only lists the means; the amounts are in the specifications.
Ask the specifications
An AI assistant is answering you. Only from what the specifications say, citing document and page; each citation is checked. Your question is processed outside your device and we do not store it under your name. What governs is the specifications.
EjemploMade-up data so you can see the result. It doesn't belong to any company or person.
Administrative specifications (PCAP) Read
Saved: Administrative specifications (PCAP), 38 pages.
Once the specifications are read, the questions, the compliance matrix and the proposal work from their text.
Sign in with your email: we'll send you a link, no password
We only keep your email to give you access. Privacy
Prepare my bid
The steps, in the order you do them. You submit on the contracting body's platform, not here.
- Decide whether to bid Should I bid?
- Read what they ask for Ask the specifications · Compliance matrix
- Prepare the paperwork Fill in the annexes of the specifications
- Review your bid Review my bid
- Submit it Submit on each platform · Add the deadline to my calendar
How much winners bid below
En 859 contratos parecidos (servicios inmobiliarios relacionados con bienes raíces propios), quien ganó bajó una mediana del 0,0 % (half of them between 0,0 % and 0,0 %). With three or more bids, 0,0 %. Only one bid was submitted in 86 % of them. Work out the abnormally low bid threshold.
How many points your reduction scores
We read the price formula in the specifications and apply it to your reduction against the best of the others.
Published by the authority
- Memoria justificativa
- Documento de aprobación del expediente
- Ficha de inventario
- Composición de la mesa de contratación
- Acuerdo de iniciación del expediente
- Reglamento vivero de empresas
Documents and notices
What Ayuntamiento de Guarromán buys and who it awards to · More tenders in Jaén · More tenders: real estate
Guarantees, payments, appeals and all the data in the notice
Guarantees
Final guarantee: 100 % of the price you bid, excluding VAT. If you bid the base budget, 3.804,95 €; with your reduction, less. It is provided by the bidder with the best offer, before the award.
How it is provided
- Bank guarantee from a bank, savings bank, credit cooperative, financial credit institution or mutual guarantee society: joint and several, waiving the benefit of discussion, payable on first demand and with no end date.
- Surety bond with an insurer authorised in that line.
- Cash or Public Debt securities, at the Caja General de Depósitos (state deposit office) or at the deposit office of the contracting region or local entity.
- Withholding from the price, only if the specifications provide for it.
The final guarantee, as a bank guarantee or surety bond, is deposited at the Caja General de Depósitos or the equivalent deposit office of the contracting administration; the provisional one, as a bank guarantee or surety bond, is handed to the contracting authority.
Check who is vouching for you
Before paying the fee, check that the entity is registered: Bank of Spain register of entities (banks and mutual guarantee societies) or register of insurers of the Directorate-General for Insurance (surety bonds).
Public Sector Contracts Act, articles 106 to 111 (BOE); General Regulation, articles 55 to 59 (BOE); Regulation of the Caja General de Depósitos, article 12 (BOE). Consulted on 7-11-2026. What the specifications of this tender say prevails.
How long it takes to pay
Guarromán Town Council paid its suppliers in 27,1 days on average (julio–septiembre de 2026). Within the 30 days the law sets.
Source of the data: Ministerio de Hacienda, average supplier payment period (RD 635/2014), consulted on 26-11-2026. When you have to be paid and what to do if you are not.
Won it? Find subcontractors
If you win, part of the work can be subcontracted: local companies with similar work and, if the specifications reserve the contract, special employment centres and integration companies. See subcontractors
Your deadlines in working days
Counted using the calendar of the authority's seat: Guarromán (Andalucía) (Law 39/2015, art. 30).
- Recurrir el anuncio o los pliegos
- Notice published on 25/11/2026: 15 working days from the day after Wednesday 25 November 2026. Expires on Friday 18 December 2026.
Si recurres los pliegos, hazlo antes de presentar tu oferta (art. 50.1.b).
Skipped, besides weekends:
- 07/12/2026 · Lunes siguiente a Día de la Constitución Española regional holiday, Andalucía
- 08/12/2026 · Immaculate Conception national holiday
- If they ask you for the documents (art. 150.2)
- If the request reaches you today, 26/11/2026: 10 working days from the day after Thursday 26 November 2026. Expires on Monday 14 December 2026.
If the act was published the same day on the contracting authority's profile, the deadline counts from the sending of the notification, not from when you open it (LCSP, Additional Provision 15): always use the earliest date.
Skipped, besides weekends:
- 07/12/2026 · Lunes siguiente a Día de la Constitución Española regional holiday, Andalucía
- 08/12/2026 · Immaculate Conception national holiday
Excluding Saturdays, Sundays and national public holidays. Public holidays of Andalucía are also deducted. Local holidays of Guarromán are deducted. Any day that the Administration's calendar of non-working days adds (art. 30.6 and 30.7 of Law 39/2015) also extends the period.
Datos de festivos.io — CC BY 4.0 — https://festivos.io. Códigos postales: GeoNames — CC BY 4.0 — https://www.geonames.org.Count another deadline with your calendar (API: since, dias, cp_organo, cp_interesado).
If you are excluded or disagree
If something in the notice or the specifications prevents you from bidding, or if the committee leaves out your bid, a special appeal on procurement may be possible, free and voluntary (art. 44.7). The special appeal applies to supply and service contracts with an estimated value above 100.000 €, and to works and works or service concessions above 3.000.000 € (art. 44.1).
- What you can appeal
- The tender notice, the specifications and the contract documents.
- Procedural acts that decide on the award, prevent continuing or leave a party defenceless; in any case, the admission or rejection of candidates and bidders and the admission or exclusion of bids, including those excluded as abnormally low (art. 149).
- The award decision.
- Certain contract modifications (arts. 204 and 205), assignments to in-house bodies and concession buy-backs.
- Before which tribunal
- Tribunal Administrativo de Recursos Contractuales de la Junta de Andalucía (TARCJA). For local entities the rule of their region applies (art. 46.4): the notice of the act tells you which tribunal covers your town council or provincial council. Source: LCSP, art. 46: órgano competente en las comunidades autónomas y entidades locales (consolidated text, accessed on 7 November 2026).
- Deadline
- 15 working days (art. 50.1). They are counted from the day after: the publication of the notice, for the notice and for the specifications (if the notice says how to access them); the day you learned of the act, for procedural acts such as an exclusion; the notification of the award. If you want to appeal the specifications, do so before submitting your bid (art. 50.1.b). The period keeps running while you ask to see the file (art. 52.2). Appealing the award suspends the procedure (art. 53). The appeal can be filed at the contracting authority's registry or at the tribunal's (art. 51.3).Source: LCSP, art. 50: iniciación del procedimiento y plazo (consolidated text, accessed on 7 November 2026).
- Applicable case law
- What is appealed and how long it takes. In 2025 the TACRC received 2.226 appeals (in 2024, 1.824). The award was appealed in 43,58 % of cases, the specifications in 25,18 % and the exclusion in 19,99 %. 15,85 % of appeals were upheld in full and 6,59 % in part; 46,95 % were dismissed and 30,64 % ended without a ruling on the merits. The average time to decide was 55 calendar days (in 2024, 46), counted from when the Tribunal has the file. Source: Memoria 2025 del Tribunal Administrativo Central de Recursos Contractuales (financial year 2025, pp. 14 and 17).
- OIReScon. The 2025 annual supervision report asks for attention to exclusions for bids deemed abnormal and to formal grounds for exclusion. Source: Informe anual de supervisión 2025 de la OIReScon: conclusiones y recomendaciones (approved on 22 December 2025). Source: Buscador de informes consultivos (OIReScon) (accessed on 7 November 2026).
- Junta Consultiva de Contratación Pública del Estado. Before leaving you out for a defect in the documents of the request (art. 150.2), they must give you a chance to correct it if it is not an absolute breach and the requirement already existed when the deadline expired. Source: Junta Consultiva de Contratación Pública del Estado, expediente 6/2021 (art. 150.2 LCSP) (file 6/2021). Source: Informes de la Junta Consultiva de Contratación Pública del Estado (accessed on 7 November 2026).
- Rulings and judgments. Search the TACRC decisions, case law on the CENDOJ. Where to look for those of your region's tribunal.
Everything about the special appeal · Review your bid before submitting it · Answer a formal request
| Contracting authority | Alcaldía del Ayuntamiento de Guarromán |
|---|---|
| Case reference | 789/2026 |
| Type of contract | Private |
| Procedure | Open |
| Base budget excluding VAT | 3.804,95 € |
| Base budget including VAT | 4.603,99 € |
| Estimated value | 3.804,95 € |
| Place of performance | Jaén |
| CPV | 70130000 · Servicios de arrendamiento de bienes raíces propios |
| End of the submission period | 28/12/2026 at 19:00 (32 days left) |
| Status | Open for bids |
| Final guarantee | 100,0 % |
Origen de los datos: Ministerio de Hacienda (Plataforma de Contratación del Sector Público). Actualizado el 25/11/2026 a las 12:16. No somos una plataforma de contratación: la oferta se presenta en la del órgano.