Servicio de auditoría y control externo del proyecto 0349 ACLIMA URBAN CENCYL 3 E en el marco del programa INTERREG VIA España-Portugal (POCTEP 2021-2027)
Servicios de contabilidad y auditoría · Services contract · Valladolid · Lasts 36 months
Should I bid?
To bid you need…
- Submit your bid on the contracting body's platform before 10/12/2026.
- Prove the solvency the notice asks for (further down, under “What they ask for”).
What an experienced bidder checks before preparing a bid, with the data behind each point. The decision is yours.
- 14 days left.
- 100 % of the points are decided by figures (the price is worth 100 out of 100).
- In 4.169 similar contracts, usually 3 bids are submitted and the winner lowers the price by 38,2 % when there are three bids or more.
- In favour: In 30 % of them there was only one bid: competition is usually low.
- It may currently be provided by SIMON MORETON AUDITORES, S.L. (a similar contract of the same body, awarded on 25/02/2025, it ends on 06/03/2028): check it in the specifications.
- Given its estimated value it may follow the abbreviated simplified procedure (art. 159.6 LCSP): no performance guarantee and less paperwork; the specifications say so.
- Simplified open procedure: no provisional guarantee, and you must be registered in ROLECE (art. 159.4.a LCSP).
Award criteria
- Mejor propuesta económica · 100,0 points · by formula
Solvency required
- Véase H.1. SOLVENCIA DEL CONTRATISTA (cláusula 9.B) TÉCNICA DEL CCP. Relación de principales contratos o sustituirlo por acreditación del personal técnico
- Véase cláusula H.1 Solvencia del contratista (cláusula 9.B) .ECONÓMICA Y FINANCIERA Aunque se ha elegido Cifra anual de negocio, se puede acreditar alternativamente también Patrimonio Neto o Declaración de Entidad Financiera
The notice only lists the means; the amounts are in the specifications.
Ask the specifications
An AI assistant is answering you. Only from what the specifications say, citing document and page; each citation is checked. Your question is processed outside your device and we do not store it under your name. What governs is the specifications.
EjemploMade-up data so you can see the result. It doesn't belong to any company or person.
Administrative specifications (PCAP) Read
Saved: Administrative specifications (PCAP), 38 pages.
Once the specifications are read, the questions, the compliance matrix and the proposal work from their text.
Sign in with your email: we'll send you a link, no password
We only keep your email to give you access. Privacy
Prepare my bid
The steps, in the order you do them. You submit on the contracting body's platform, not here.
- Decide whether to bid Should I bid?
- Read what they ask for Ask the specifications · Compliance matrix
- Prepare the paperwork Fill in the annexes of the specifications
- Review your bid Review my bid
- Submit it Submit on each platform · Add the deadline to my calendar
Quién puede estar prestándolo
El mismo órgano adjudicó un contrato del mismo sector, con un objeto parecido y de un importe del mismo orden, que sigue vivo o acaba de vencer:
- SIMON MORETON AUDITORES, S.L. · 2.225,00 € sin IVA · adjudicado el 25/02/2025 · vence el 06/03/2028
Auditoría y Control Externo de los proyectos europeos “0027_ADAPT_CLIMA_CENCYL_3_E” y “0035_CIRCULAR_ECOSYSTEMS_6_E” del programa de Cooperación “Interreg VI-A España – Portugal (POCTEP 2021-2027)” (expediente AI- 55/2023)
Lo deducimos de las adjudicaciones publicadas; comprueba en el pliego que es el mismo servicio.
How much winners bid below
En 4.169 contratos parecidos (servicios de contabilidad, de auditoría y fiscales), quien ganó bajó una mediana del 25,9 % (half of them between 8,9 % and 43,1 %). With three or more bids, 38,2 %. Only one bid was submitted in 30 % of them. Work out the abnormally low bid threshold.
How many points your reduction scores
We read the price formula in the specifications and apply it to your reduction against the best of the others.
Documents and notices
What Ayuntamiento de Valladolid buys and who it awards to · More tenders in Valladolid · More tenders: business services
Guarantees, payments, appeals and all the data in the notice
Guarantees
Final guarantee: 5 % of the price you bid, excluding VAT. If you bid the base budget, 111,25 €; with your reduction, less. It is provided by the bidder with the best offer, before the award.
How it is provided
- Bank guarantee from a bank, savings bank, credit cooperative, financial credit institution or mutual guarantee society: joint and several, waiving the benefit of discussion, payable on first demand and with no end date.
- Surety bond with an insurer authorised in that line.
- Cash or Public Debt securities, at the Caja General de Depósitos (state deposit office) or at the deposit office of the contracting region or local entity.
- Withholding from the price, only if the specifications provide for it.
The final guarantee, as a bank guarantee or surety bond, is deposited at the Caja General de Depósitos or the equivalent deposit office of the contracting administration; the provisional one, as a bank guarantee or surety bond, is handed to the contracting authority.
Check who is vouching for you
Before paying the fee, check that the entity is registered: Bank of Spain register of entities (banks and mutual guarantee societies) or register of insurers of the Directorate-General for Insurance (surety bonds).
Public Sector Contracts Act, articles 106 to 111 (BOE); General Regulation, articles 55 to 59 (BOE); Regulation of the Caja General de Depósitos, article 12 (BOE). Consulted on 7-11-2026. What the specifications of this tender say prevails.
How long it takes to pay
Valladolid Town Council paid its suppliers in 23,6 days on average (julio–septiembre de 2026). Within the 30 days the law sets.
Source of the data: Ministerio de Hacienda, average supplier payment period (RD 635/2014), consulted on 26-11-2026. When you have to be paid and what to do if you are not.
Won it? Find subcontractors
If you win, part of the work can be subcontracted: local companies with similar work and, if the specifications reserve the contract, special employment centres and integration companies. See subcontractors
Minimum staff cost under the collective agreement
In services, staff cost sets the minimum price you can bid. Choose the collective agreement, enter its pay scale and check whether your bid covers it (art. 149.4 LCSP). Work out the staff cost
Your deadlines in working days
Counted using the calendar of the authority's seat: Valladolid (Castilla y León) (Law 39/2015, art. 30).
- If they ask you for the documents (art. 150.2)
- If the request reaches you today, 26/11/2026: 7 working days from the day after Thursday 26 November 2026. Expires on Wednesday 9 December 2026.
If the act was published the same day on the contracting authority's profile, the deadline counts from the sending of the notification, not from when you open it (LCSP, Additional Provision 15): always use the earliest date.
Skipped, besides weekends:
- 07/12/2026 · Lunes siguiente a Día de la Constitución Española regional holiday, Castilla y León
- 08/12/2026 · Immaculate Conception national holiday
Excluding Saturdays, Sundays and national public holidays. Public holidays of Castilla y León are also deducted. Local holidays of Valladolid are deducted. Any day that the Administration's calendar of non-working days adds (art. 30.6 and 30.7 of Law 39/2015) also extends the period.
Datos de festivos.io — CC BY 4.0 — https://festivos.io. Códigos postales: GeoNames — CC BY 4.0 — https://www.geonames.org.Count another deadline with your calendar (API: since, dias, cp_organo, cp_interesado).
If you are excluded or disagree
This contract is below 100.000 € of estimated value: it is not subject to the special appeal. Its acts are appealed under Law 39/2015 and Law 29/1998 on the contentious-administrative jurisdiction (art. 44.6). Before submitting, review your bid so that there is nothing to appeal. Source: LCSP, art. 44: recurso especial en materia de contratación, actos recurribles (consolidated text, accessed on 7 November 2026).
| Contracting authority | Alcaldía del Ayuntamiento de Valladolid |
|---|---|
| Case reference | 2026 SAB 01 000003 |
| Type of contract | Services |
| Procedure | Simplified open |
| Régimen | Ley de Contratos del Sector Público |
| Base budget excluding VAT | 2.224,99 € |
| Base budget including VAT | 2.692,24 € |
| Estimated value | 2.224,99 € |
| Place of performance | Valladolid |
| CPV | 79210000 · Servicios de contabilidad y auditoría; 79212000 · Servicios de auditoría |
| End of the submission period | 10/12/2026 at 14:00 (14 days left) |
| Status | Open for bids |
| Final guarantee | 5,0 % |
Régimen de esta licitación
- Ley de Contratos del Sector Público Ley 9/2017, de Contratos del Sector Público (LCSP)
Contrato regido por la Ley 9/2017. - Fondos de la UE Código de financiación EU
La financiación europea trae obligaciones de información y de publicidad: el pliego las detalla. - Fondo Europeo de Desarrollo Regional (FEDER) Código de financiación FEDER
La financiación europea trae obligaciones de información y de publicidad: el pliego las detalla.
Origen de los datos: Ministerio de Hacienda (Plataforma de Contratación del Sector Público). Actualizado el 24/11/2026 a las 14:25. No somos una plataforma de contratación: la oferta se presenta en la del órgano.