Servicios de explotación para la red AIS de Puertos del Estado
Servicios TI: consultoría, desarrollo de software, Internet y apoyo · Services contract · Madrid · Lasts 24 months
Second chance
Last time it tendered something like this, only one company bid (08/01/2025), and now it comes out with 7 % more budget. When competition is so low, one more company has plenty of chances.
The precedent, from the same authority and with a similar subject: Servicios de explotación para la red AIS de Puertos del Estado (file E/049/24), budget at the time 590.000,00 € excluding VAT. More tenders like this.
Should I bid?
To bid you need…
- Submit your bid on the contracting body's platform before 12/01/2027.
- Prove the solvency the notice asks for (further down, under “What they ask for”).
- A technical proposal: the value judgement is 60 % of the points.
What an experienced bidder checks before preparing a bid, with the data behind each point. The decision is yours.
- In favour: 47 days left: there is time for the technical proposal.
- The technical proposal decides: 60 % of the points are a value judgement; the price, 40 out of 100.
- In 19 contracts of this body in the same sector, usually 1 bid is submitted and the winner lowers the price by 4,3 % when there are three bids or more.
- In favour: In 68 % of them there was only one bid: competition is usually low.
- It may currently be provided by GMV AEROSPACE AND DEFENCE, S.A.U (a similar contract of the same body, awarded on 08/01/2025, it ends on 17/01/2027): check it in the specifications.
- If you win, you have 10 working days to hand in the documents that prove what you declared (art. 150.2 LCSP) and to lodge a performance guarantee of 5 % (up to 31.445 €).
Award criteria
- 3 Plan de mantenimiento · 12,0 points · value judgement
- 6 Otras Mejoras · 1,2 points · value judgement
- 4 Mejora en equipo humano · 12,0 points · value judgement
- 1 Memoria Técnica · 12,0 points · value judgement
- 5 Plan de transición y retorno · 10,8 points · value judgement
- 2 Plan de gestión del Proyecto · 12,0 points · value judgement
- Oferta Económica · 40,0 points · by formula
Solvency required
- Declaración responsable conforme al modelo Anexo-2 en lo referente al personal responsable de la ejecución del contrato y adscrito al mismo, según el punto 2 del apartado F.2) del Cuadro de Características y la cláusula 13, apartado "SOLVENCIA PROFESIONAL DEL EQUIPO HUMANO ASIGNADO AL CONTRATO Y MED
- Declaración responsable conforme al modelo Anexo-2, en lo referente a la certificación ISO 9000 o equivalente, según se establece en el punto 4 del apartado F.2) del Cuadro de Características y en la cláusula 13, apartado "SOLVENCIA TÉCNICA DE LA EMPRESA", del Pliego de Prescripciones Técnicas.
- Declaración responsable conforme al modelo Anexo-2 en lo referente a la parte II.D. "Información relativa a los subcontratistas (...)", y según el punto 6 del apartado F.2) del Cuadro de Características y la cláusula 13, apartado "SOLVENCIA PROFESIONAL DEL EQUIPO HUMANO ASIGNADO AL CONTRATO Y MEDIOS
- Declaración responsable conforme al modelo Anexo-2 en lo referente al personal responsable de la ejecución del contrato y adscrito al mismo, según el punto 3 del apartado F.2) del Cuadro de Características y la cláusula 13, apartado "SOLVENCIA PROFESIONAL DEL EQUIPO HUMANO ASIGNADO AL CONTRATO Y MED
- Declaración responsable conforme al modelo Anexo-2, en lo referente a las certificaciones ISO 14000 o equivalente, según se establece en el punto 5 del apartado F.2) del Cuadro de Características y en la cláusula 13, apartado "SOLVENCIA TÉCNICA DE LA EMPRESA", del Pliego de Prescripciones Técnicas.
- Declaración responsable conforme al modelo Anexo-2 en lo referente a los trabajos y servicios realizados, según el punto 1 del apartado F.2) del Cuadro de Características y la cláusula 13, apartado "SOLVENCIA TÉCNICA DE LA EMPRESA", del Pliego de Prescripciones Técnicas.
- Declaración Responsable, conforme al modelo Anexo-2, referida a los Criterios de Selección (solvencia económica y financiera), según los puntos 2 y ss. del apartado F.1) del Cuadro de Características incluido en el Documento de Pliegos publicado.
- Declaración responsable conforme al modelo Anexo-2, en lo referente al volumen anual de negocio según se establece en el punto 1 del apartado F.1) del Cuadro de Características y en la cláusula 13, apartado "SOLVENCIA ECONÓMICA" del Pliego de Prescripciones Técnicas.
- Cumplimiento con las obligaciones tributarias
- Para las empresas extranjeras, declaración de sometimiento a la legislación española.
- No prohibición para contratar
- Cumplimiento con las obligaciones con la Seguridad Social
The notice only lists the means; the amounts are in the specifications.
Short of solvency? Look for a partner for a joint venture (UTE)
In a joint venture (UTE) the solvency of each company is added together. We show you who has won contracts of the same kind for the amount that is missing.
Ask the specifications
An AI assistant is answering you. Only from what the specifications say, citing document and page; each citation is checked. Your question is processed outside your device and we do not store it under your name. What governs is the specifications.
EjemploMade-up data so you can see the result. It doesn't belong to any company or person.
Administrative specifications (PCAP) Read
Saved: Administrative specifications (PCAP), 38 pages.
Once the specifications are read, the questions, the compliance matrix and the proposal work from their text.
Sign in with your email: we'll send you a link, no password
We only keep your email to give you access. Privacy
Prepare my bid
The steps, in the order you do them. You submit on the contracting body's platform, not here.
- Decide whether to bid Should I bid?
- Read what they ask for Ask the specifications · Compliance matrix
- Prepare the paperwork Fill in the annexes of the specifications
- Write the technical proposal Guided technical proposal · Simulated evaluator
- Review your bid Review my bid
- Submit it Submit on each platform · Add the deadline to my calendar
Quién puede estar prestándolo
El mismo órgano adjudicó un contrato del mismo sector, con un objeto parecido y de un importe del mismo orden, que sigue vivo o acaba de vencer:
- GMV AEROSPACE AND DEFENCE, S.A.U · 590.000,00 € sin IVA · adjudicado el 08/01/2025 · vence el 17/01/2027
Servicios de explotación para la red AIS de Puertos del Estado (expediente E/049/24)
Lo deducimos de las adjudicaciones publicadas; comprueba en el pliego que es el mismo servicio.
How much winners bid below
En 19 contratos de este órgano en el mismo sector (informática y consultoría TI), quien ganó bajó una mediana del 0,8 % (half of them between 0,0 % and 8,4 %). With three or more bids, 4,3 %. Only one bid was submitted in 68 % of them. Work out the abnormally low bid threshold.
Comparable awards
En 806 contratos basados en acuerdos marco parecidos, el importe adjudicado sin IVA tiene una mediana de 174.900,00 € (la mitad, entre 63.093,50 € y 426.822,95 €).
- Renovación de productos software de infraestructura de sistemas · 628.603,11 € · SOFTWAREONE SPAIN S.A. · 2026-05-25
- Contrato específico del Sistema Dinámico de Adquisición (SDA 26/2021) para los Servicios de desarrollo de sistemas de administración electrónica. Proyectos de i · 630.712,76 € · INDRA SOLUCIONES TECNOLOGIAS DE LA INFORMACION S.L.U. · 2026-03-17
- Renovación y soporte técnico de las suscripciones software LINUX para la Infraestructura Integral de la Información de la Defensa (I3D) 2026-2027 · 632.258,61 € · LOGICALIS SPAIN S.L.U. · 2026-06-19
- Suministro de licencias para la solución de gestión de eventos de seguridad · 622.000,00 € · GMV SOLUCIONES GLOBALES INTERNET S.A.U · 2026-06-18
- Prórroga del contrato A354/2025. Desarrollo de la nueva versión del sistema de Gestión Contable GECO Contable para el Instituto de Turismo de España O.A. TURESP · 636.500,00 € · ALTEN SOLUCIONES PRODUCTOS AUDITORIA E INGENIERÍA, S.A.U. · 2026-03-05
Son contratos basados en acuerdos marco de la compra centralizada del Estado, con precios y empresas ya fijados por el acuerdo: sirven de referencia de precio, no son licitaciones abiertas. Se comparan por el CPV de esta licitación y por las palabras del título; el feed no trae CPV. La baja solo se calcula con los contratos que traen presupuesto. Origen de los datos: Dirección General de Racionalización y Centralización de la Contratación – Ministerio de Hacienda.
How many points your reduction scores
We read the price formula in the specifications and apply it to your reduction against the best of the others.
Documents and notices
What Organismo Público Puertos del Estado buys and who it awards to · More tenders in Madrid · More tenders: iT and IT consulting
Guarantees, payments, appeals and all the data in the notice
Guarantees
Final guarantee: 5 % of the price you bid, excluding VAT. If you bid the base budget, 31.445,00 €; with your reduction, less. It is provided by the bidder with the best offer, before the award.
How it is provided
- Bank guarantee from a bank, savings bank, credit cooperative, financial credit institution or mutual guarantee society: joint and several, waiving the benefit of discussion, payable on first demand and with no end date.
- Surety bond with an insurer authorised in that line.
- Cash or Public Debt securities, at the Caja General de Depósitos (state deposit office) or at the deposit office of the contracting region or local entity.
- Withholding from the price, only if the specifications provide for it.
The final guarantee, as a bank guarantee or surety bond, is deposited at the Caja General de Depósitos or the equivalent deposit office of the contracting administration; the provisional one, as a bank guarantee or surety bond, is handed to the contracting authority.
Check who is vouching for you
Before paying the fee, check that the entity is registered: Bank of Spain register of entities (banks and mutual guarantee societies) or register of insurers of the Directorate-General for Insurance (surety bonds).
Public Sector Contracts Act, articles 106 to 111 (BOE); General Regulation, articles 55 to 59 (BOE); Regulation of the Caja General de Depósitos, article 12 (BOE). Consulted on 7-11-2026. What the specifications of this tender say prevails.
Won it? Find subcontractors
If you win, part of the work can be subcontracted: local companies with similar work and, if the specifications reserve the contract, special employment centres and integration companies. See subcontractors
Minimum staff cost under the collective agreement
In services, staff cost sets the minimum price you can bid. Choose the collective agreement, enter its pay scale and check whether your bid covers it (art. 149.4 LCSP). Work out the staff cost
Your deadlines in working days
Counted using the calendar of the authority's seat: Madrid (Comunidad de Madrid) (Law 39/2015, art. 30).
- Recurrir el anuncio o los pliegos
- Notice published on 25/11/2026: 15 working days from the day after Wednesday 25 November 2026. Expires on Friday 18 December 2026.
Si recurres los pliegos, hazlo antes de presentar tu oferta (art. 50.1.b).
Skipped, besides weekends:
- 07/12/2026 · Lunes siguiente a Día de la Constitución Española regional holiday, Comunidad de Madrid
- 08/12/2026 · Immaculate Conception national holiday
- If they ask you for the documents (art. 150.2)
- If the request reaches you today, 26/11/2026: 10 working days from the day after Thursday 26 November 2026. Expires on Monday 14 December 2026.
If the act was published the same day on the contracting authority's profile, the deadline counts from the sending of the notification, not from when you open it (LCSP, Additional Provision 15): always use the earliest date.
Skipped, besides weekends:
- 07/12/2026 · Lunes siguiente a Día de la Constitución Española regional holiday, Comunidad de Madrid
- 08/12/2026 · Immaculate Conception national holiday
Excluding Saturdays, Sundays and national public holidays. Public holidays of Comunidad de Madrid are also deducted. Local holidays of Madrid are deducted. Any day that the Administration's calendar of non-working days adds (art. 30.6 and 30.7 of Law 39/2015) also extends the period.
Datos de festivos.io — CC BY 4.0 — https://festivos.io. Códigos postales: GeoNames — CC BY 4.0 — https://www.geonames.org.Count another deadline with your calendar (API: since, dias, cp_organo, cp_interesado).
If you are excluded or disagree
If something in the notice or the specifications prevents you from bidding, or if the committee leaves out your bid, you can go for free before a specialised tribunal: the special appeal on procurement, which is voluntary (art. 44.7).
- What you can appeal
- The tender notice, the specifications and the contract documents.
- Procedural acts that decide on the award, prevent continuing or leave a party defenceless; in any case, the admission or rejection of candidates and bidders and the admission or exclusion of bids, including those excluded as abnormally low (art. 149).
- The award decision.
- Certain contract modifications (arts. 204 and 205), assignments to in-house bodies and concession buy-backs.
- Before which tribunal
- Tribunal Administrativo Central de Recursos Contractuales (TACRC). Source: LCSP, art. 45: órgano competente en la Administración General del Estado (consolidated text, accessed on 7 November 2026).
- Deadline
- 15 working days (art. 50.1). They are counted from the day after: the publication of the notice, for the notice and for the specifications (if the notice says how to access them); the day you learned of the act, for procedural acts such as an exclusion; the notification of the award. If you want to appeal the specifications, do so before submitting your bid (art. 50.1.b). The period keeps running while you ask to see the file (art. 52.2). Appealing the award suspends the procedure (art. 53). The appeal can be filed at the contracting authority's registry or at the tribunal's (art. 51.3).Source: LCSP, art. 50: iniciación del procedimiento y plazo (consolidated text, accessed on 7 November 2026).
- Applicable case law
- What is appealed and how long it takes. In 2025 the TACRC received 2.226 appeals (in 2024, 1.824). The award was appealed in 43,58 % of cases, the specifications in 25,18 % and the exclusion in 19,99 %. 15,85 % of appeals were upheld in full and 6,59 % in part; 46,95 % were dismissed and 30,64 % ended without a ruling on the merits. The average time to decide was 55 calendar days (in 2024, 46), counted from when the Tribunal has the file. Source: Memoria 2025 del Tribunal Administrativo Central de Recursos Contractuales (financial year 2025, pp. 14 and 17).
- OIReScon. The 2025 annual supervision report asks for attention to exclusions for bids deemed abnormal and to formal grounds for exclusion. Source: Informe anual de supervisión 2025 de la OIReScon: conclusiones y recomendaciones (approved on 22 December 2025). Source: Buscador de informes consultivos (OIReScon) (accessed on 7 November 2026).
- Junta Consultiva de Contratación Pública del Estado. Before leaving you out for a defect in the documents of the request (art. 150.2), they must give you a chance to correct it if it is not an absolute breach and the requirement already existed when the deadline expired. Source: Junta Consultiva de Contratación Pública del Estado, expediente 6/2021 (art. 150.2 LCSP) (file 6/2021). Source: Informes de la Junta Consultiva de Contratación Pública del Estado (accessed on 7 November 2026).
- Rulings and judgments. Search the TACRC decisions, case law on the CENDOJ. Where to look for those of your region's tribunal.
Everything about the special appeal · Review your bid before submitting it · Answer a formal request
| Contracting authority | Presidencia del Organismo Público Puertos del Estado |
|---|---|
| Case reference | E/071/26 |
| Type of contract | Services |
| Procedure | Open |
| Régimen | Sectores especiales: agua, energía, transportes y servicios postales |
| Base budget excluding VAT | 628.900,00 € |
| Base budget including VAT | 760.969,00 € |
| Estimated value | 628.900,00 € |
| Place of performance | Madrid |
| CPV | 72000000 · Servicios TI: consultoría, desarrollo de software, Internet y apoyo |
| End of the submission period | 12/01/2027 at 12:00 (47 days left) |
| Status | Open for bids |
| Final guarantee | 5,0 % |
Régimen de esta licitación
- Sectores especiales: agua, energía, transportes y servicios postales Real Decreto-ley 3/2020, Libro primero (transpone la Directiva 2014/25/UE)
La entidad contrata con las reglas de los sectores especiales, no con las de la Ley 9/2017: tiene su propio régimen de procedimientos y plazos. Lee el pliego o las normas de contratación de la entidad antes de preparar la oferta.
Origen de los datos: Ministerio de Hacienda (Plataforma de Contratación del Sector Público). Actualizado el 25/11/2026 a las 09:28. No somos una plataforma de contratación: la oferta se presenta en la del órgano.