Should I bid?
To bid you need…
- Submit your bid on the contracting body's platform before 11/01/2027.
- Prove the solvency the notice asks for (further down, under “What they ask for”).
- A technical proposal: the value judgement is 20 % of the points.
What an experienced bidder checks before preparing a bid, with the data behind each point. The decision is yours.
- In favour: 46 days left: there is time for the technical proposal.
- 80 % of the points are decided by figures (the price is worth 40 out of 100); 20 %, by the technical proposal.
- In 27 contracts of this body in the same sector, usually 1 bid is submitted and the winner lowers the price by 6,6 % when there are three bids or more.
- In favour: In 59 % of them there was only one bid: competition is usually low.
- If you win, you have 10 working days to hand in the documents that prove what you declared (art. 150.2 LCSP) and to lodge a performance guarantee of 5 % (up to 174.428 €).
- Subject to harmonised regulation: it is also published in the OJEU and a special appeal is possible.
Award criteria
- Criterios evaluables mediante fórmula · 40,0 points · by formula
- Criterios evaluables mediante juicio de valor · 20,0 points · value judgement
- Oferta económica · 40,0 points · by formula
Solvency required
- Uso de sistemas de información en la prestación del contrato: REQUISITO MÍNIMO: Estar en posesión de una Certificación de Conformidad con el ENS para sistemas de categoría MEDIA expedida con un alcance que cubra el objeto de la presente contratación, debiendo encontrarse en vigor durante todo el per
- Necesidad de indicar en la oferta la información relativa a subcontratación
- Relación de los principales servicios o trabajos realizados en los tres últimos años que sean de igual o similar naturaleza que los que constituyen el objeto del contrato, tomándose como criterio de correspondencia entre los servicios ejecutados por el empresario y aquellos que constituyen el objeto
- Medios personales mínimos a adscribir a la ejecución del contrato: Se deberán adscribir a la ejecución del Contrato todos los medios personales requeridos en el apartado F.3. en número, dedicación y capacidades indicadas, así como los que resulten de la oferta del adjudicatario. Asimismo, deberán ad
- ISO 20000 Sistema de Gestión de Servicios de Tecnologías de la Información o equivalente. ALCANCE: Objeto del contrato (soporte y operación de sistemas IT y/o mantenimiento de aplicaciones)
- Indicación del personal técnico o de las unidades técnicas, integradas o no en la empresa, participantes en el contrato, especialmente aquellos encargados del control de calidad. Según lo establecido en el punto F.3.
- Titulaciones académicas y profesionales del empresario y del personal directivo de la empresa y, en particular, del personal responsable de la ejecución del contrato, así como de los técnicos encargados directamente de la misma, siempre que no se evalúen como un criterio de adjudicación. Requisito m
- Volumen anual de negocios, o bien volumen anual de negocios en el ámbito al que se refiera el contrato, en los tres últimos ejercicios concluidos, en función de las fechas de constitución o de inicio de actividades para el empresario. Requisito mínimo: Importe mínimo al menos de 4.000.000 euros/año
- No prohibición para contratar
- Cumplimiento con las obligaciones con la Seguridad Social
- No estar incurso en incompatibilidades
- Para las empresas extranjeras, declaración de sometimiento a la legislación española.
The notice only lists the means; the amounts are in the specifications.
Short of solvency? Look for a partner for a joint venture (UTE)
In a joint venture (UTE) the solvency of each company is added together. We show you who has won contracts of the same kind for the amount that is missing.
Ask the specifications
An AI assistant is answering you. Only from what the specifications say, citing document and page; each citation is checked. Your question is processed outside your device and we do not store it under your name. What governs is the specifications.
EjemploMade-up data so you can see the result. It doesn't belong to any company or person.
Administrative specifications (PCAP) Read
Saved: Administrative specifications (PCAP), 38 pages.
Once the specifications are read, the questions, the compliance matrix and the proposal work from their text.
Sign in with your email: we'll send you a link, no password
We only keep your email to give you access. Privacy
Prepare my bid
The steps, in the order you do them. You submit on the contracting body's platform, not here.
- Decide whether to bid Should I bid?
- Read what they ask for Ask the specifications · Compliance matrix
- Prepare the paperwork Fill in the annexes of the specifications
- Write the technical proposal Guided technical proposal · Simulated evaluator
- Review your bid Review my bid
- Submit it Submit on each platform · Add the deadline to my calendar
How much winners bid below
En 27 contratos de este órgano en el mismo sector (informática y consultoría TI), quien ganó bajó una mediana del 3,2 % (half of them between 0,0 % and 15,6 %). With three or more bids, 6,6 %. Only one bid was submitted in 59 % of them. Work out the abnormally low bid threshold.
Comparable awards
En 806 contratos basados en acuerdos marco parecidos, el importe adjudicado sin IVA tiene una mediana de 174.900,00 € (la mitad, entre 63.093,50 € y 426.822,95 €).
- Desarrollo evolutivo y soporte al mantenimiento de aplicaciones de microservicios en la Subsecretaría de Interior. · 854.457,31 € · Hiberus Global IT Services, S.L.U. · 2026-07-17
- Desarrollo evolutivo y soporte al mantenimiento de aplicaciones de microservicios en la Subsecretaría de Interior. · 569.600,00 € · Hiberus Global IT Services, S.L.U. · 2025-03-03
- Suministro de las suscripciones y el servicio de soporte de 20.000 licencias destinadas a la orquestación de procesos de negocio en entornos mainframe y distrib · 3.596.588,24 € · TÉCNICOS ASOCIADOS INFORMÁTICA, SAU · 2026-07-22
- Renovación y soporte de las suscripciones de software de integración de sistemas y aplicaciones en la Infraestructura Integral de la Información de la Defensa ( · 4.266.263,93 € · INETUM ESPAÑA, S.A. · 2026-02-20
- X260145PJNEE; Suministro de licencias software para la ejecución y desarrollo de aplicaciones de la DIRECCION GENERAL DE LA POLICÍA. · 2.427.823,85 € · TELEFONICA SOLUCIONES DE INFORMATICA Y COMUNICACIONES DE ESPAÑA S.A.U. · 2026-07-17
Son contratos basados en acuerdos marco de la compra centralizada del Estado, con precios y empresas ya fijados por el acuerdo: sirven de referencia de precio, no son licitaciones abiertas. Se comparan por el CPV de esta licitación y por las palabras del título; el feed no trae CPV. La baja solo se calcula con los contratos que traen presupuesto. Origen de los datos: Dirección General de Racionalización y Centralización de la Contratación – Ministerio de Hacienda.
How many points your reduction scores
We read the price formula in the specifications and apply it to your reduction against the best of the others.
Published by the authority
Documents and notices
What Autoridad Portuaria de Valencia buys and who it awards to · More tenders in Valencia · More tenders: iT and IT consulting
Guarantees, payments, appeals and all the data in the notice
Guarantees
Final guarantee: 5 % of the price you bid, excluding VAT. If you bid the base budget, 174.428,27 €; with your reduction, less. It is provided by the bidder with the best offer, before the award.
How it is provided
- Bank guarantee from a bank, savings bank, credit cooperative, financial credit institution or mutual guarantee society: joint and several, waiving the benefit of discussion, payable on first demand and with no end date.
- Surety bond with an insurer authorised in that line.
- Cash or Public Debt securities, at the Caja General de Depósitos (state deposit office) or at the deposit office of the contracting region or local entity.
- Withholding from the price, only if the specifications provide for it.
The final guarantee, as a bank guarantee or surety bond, is deposited at the Caja General de Depósitos or the equivalent deposit office of the contracting administration; the provisional one, as a bank guarantee or surety bond, is handed to the contracting authority.
Check who is vouching for you
Before paying the fee, check that the entity is registered: Bank of Spain register of entities (banks and mutual guarantee societies) or register of insurers of the Directorate-General for Insurance (surety bonds).
Public Sector Contracts Act, articles 106 to 111 (BOE); General Regulation, articles 55 to 59 (BOE); Regulation of the Caja General de Depósitos, article 12 (BOE). Consulted on 7-11-2026. What the specifications of this tender say prevails.
Won it? Find subcontractors
If you win, part of the work can be subcontracted: local companies with similar work and, if the specifications reserve the contract, special employment centres and integration companies. See subcontractors
Minimum staff cost under the collective agreement
In services, staff cost sets the minimum price you can bid. Choose the collective agreement, enter its pay scale and check whether your bid covers it (art. 149.4 LCSP). Work out the staff cost
Your deadlines in working days
Counted using the calendar of the authority's seat: València (Comunitat Valenciana) (Law 39/2015, art. 30).
- Recurrir el anuncio o los pliegos
- Notice published on 25/11/2026: 15 working days from the day after Wednesday 25 November 2026. Expires on Thursday 17 December 2026.
Si recurres los pliegos, hazlo antes de presentar tu oferta (art. 50.1.b).
Skipped, besides weekends:
- 08/12/2026 · Immaculate Conception national holiday
- If they ask you for the documents (art. 150.2)
- If the request reaches you today, 26/11/2026: 10 working days from the day after Thursday 26 November 2026. Expires on Friday 11 December 2026.
If the act was published the same day on the contracting authority's profile, the deadline counts from the sending of the notification, not from when you open it (LCSP, Additional Provision 15): always use the earliest date.
Skipped, besides weekends:
- 08/12/2026 · Immaculate Conception national holiday
Excluding Saturdays, Sundays and national public holidays. Public holidays of Comunitat Valenciana are also deducted. Local holidays of València are deducted. Any day that the Administration's calendar of non-working days adds (art. 30.6 and 30.7 of Law 39/2015) also extends the period.
Datos de festivos.io — CC BY 4.0 — https://festivos.io. Códigos postales: GeoNames — CC BY 4.0 — https://www.geonames.org.Count another deadline with your calendar (API: since, dias, cp_organo, cp_interesado).
If you are excluded or disagree
If something in the notice or the specifications prevents you from bidding, or if the committee leaves out your bid, you can go for free before a specialised tribunal: the special appeal on procurement, which is voluntary (art. 44.7).
- What you can appeal
- The tender notice, the specifications and the contract documents.
- Procedural acts that decide on the award, prevent continuing or leave a party defenceless; in any case, the admission or rejection of candidates and bidders and the admission or exclusion of bids, including those excluded as abnormally low (art. 149).
- The award decision.
- Certain contract modifications (arts. 204 and 205), assignments to in-house bodies and concession buy-backs.
- Before which tribunal
- Tribunal Administrativo Central de Recursos Contractuales (TACRC). Source: LCSP, art. 45: órgano competente en la Administración General del Estado (consolidated text, accessed on 7 November 2026).
- Deadline
- 15 working days (art. 50.1). They are counted from the day after: the publication of the notice, for the notice and for the specifications (if the notice says how to access them); the day you learned of the act, for procedural acts such as an exclusion; the notification of the award. If you want to appeal the specifications, do so before submitting your bid (art. 50.1.b). The period keeps running while you ask to see the file (art. 52.2). Appealing the award suspends the procedure (art. 53). The appeal can be filed at the contracting authority's registry or at the tribunal's (art. 51.3).Source: LCSP, art. 50: iniciación del procedimiento y plazo (consolidated text, accessed on 7 November 2026).
- Applicable case law
- What is appealed and how long it takes. In 2025 the TACRC received 2.226 appeals (in 2024, 1.824). The award was appealed in 43,58 % of cases, the specifications in 25,18 % and the exclusion in 19,99 %. 15,85 % of appeals were upheld in full and 6,59 % in part; 46,95 % were dismissed and 30,64 % ended without a ruling on the merits. The average time to decide was 55 calendar days (in 2024, 46), counted from when the Tribunal has the file. Source: Memoria 2025 del Tribunal Administrativo Central de Recursos Contractuales (financial year 2025, pp. 14 and 17).
- OIReScon. The 2025 annual supervision report asks for attention to exclusions for bids deemed abnormal and to formal grounds for exclusion. Source: Informe anual de supervisión 2025 de la OIReScon: conclusiones y recomendaciones (approved on 22 December 2025). Source: Buscador de informes consultivos (OIReScon) (accessed on 7 November 2026).
- Junta Consultiva de Contratación Pública del Estado. Before leaving you out for a defect in the documents of the request (art. 150.2), they must give you a chance to correct it if it is not an absolute breach and the requirement already existed when the deadline expired. Source: Junta Consultiva de Contratación Pública del Estado, expediente 6/2021 (art. 150.2 LCSP) (file 6/2021). Source: Informes de la Junta Consultiva de Contratación Pública del Estado (accessed on 7 November 2026).
- Rulings and judgments. Search the TACRC decisions, case law on the CENDOJ. Where to look for those of your region's tribunal.
Everything about the special appeal · Review your bid before submitting it · Answer a formal request
| Contracting authority | Presidencia de la Autoridad Portuaria de Valencia |
|---|---|
| Case reference | EC26-C05-03320 |
| Type of contract | Services |
| Procedure | Open |
| Régimen | Ley de Contratos del Sector Público; Regulación armonizada |
| Base budget excluding VAT | 3.488.565,43 € |
| Base budget including VAT | 4.221.164,17 € |
| Estimated value | 10.465.696,29 € |
| Place of performance | Valencia/València |
| CPV | 72000000 · Servicios TI: consultoría, desarrollo de software, Internet y apoyo |
| End of the submission period | 11/01/2027 at 13:00 (46 days left) |
| Status | Open for bids |
| Final guarantee | 5,0 % |
Régimen de esta licitación
- Ley de Contratos del Sector Público Ley 9/2017, de Contratos del Sector Público (LCSP)
Contrato regido por la Ley 9/2017. - Regulación armonizada Art. 19 de la Ley 9/2017
Supera el umbral europeo: el anuncio también sale en el Diario Oficial de la UE, y el DEUC y los plazos mínimos son los de la UE.