Sustitución de cubierta de vestuarios del gimnasio del antiguo colegio Atarazanas. Teruel
Colocación de cubiertas metálicas · Works contract · Teruel · Lasts 2,1 months
Should I bid?
To bid you need…
- Submit your bid on the contracting body's platform before 14/12/2026.
- Prove the solvency the notice asks for (further down, under “What they ask for”).
- A technical proposal: the value judgement is 20 % of the points.
What an experienced bidder checks before preparing a bid, with the data behind each point. The decision is yours.
- In favour: 21 days left: there is time for the technical proposal.
- 80 % of the points are decided by figures (the price is worth 100 out of 125); 20 %, by the technical proposal.
- In 19 contracts of this body in the same sector, usually 3 bids are submitted and the winner lowers the price by 9,1 % when there are three bids or more.
- Given its estimated value it may follow the abbreviated simplified procedure (art. 159.6 LCSP): no performance guarantee and less paperwork; the specifications say so.
- Simplified open procedure: no provisional guarantee, and you must be registered in ROLECE (art. 159.4.a LCSP).
Award criteria
- Criterio 1: Precio más bajo. · 100,0 points · by formula
- Criterio 2: Criterio sujeto a juicio de valor · 25,0 points · value judgement
Solvency required
- Por los siguientes medios, (exigiéndose los dos siguientes): Medio 1.- Declaración responsable indicando el personal técnico u organismos técnicos, estén o no integrados en la empresa, de los que esta disponga para la ejecución de las obras. En cuanto a medios personales, se justificará la disposic
- Por los siguientes medios, (exigiéndose los dos siguientes): Medio 2.- Declaración responsable indicando la maquinaria, material y equipo técnico del que se dispondrá para la ejecución de las obras. El órgano de contratación requerirá, a través de la mesa de contratación, la presentación de los doc
- Por uno de los dos medios siguientes: Medio 1: Volumen anual de negocios, referido al mejor ejercicio dentro de los tres últimos disponibles. Se requerirá como mínimo que el volumen de negocios anual exigido será una vez y media el valor estimado del contrato, esto es 76.719,42 euros. Deberá aporta
- Por uno de los dos medios siguientes: Medio 2: El ratio entre activos y pasivos, al cierre del último ejercicio económico para el que esté vencida la obligación de aprobación de cuentas anuales por importe igual o superior a 1,5. Esta ratio se obtendrá mediante la siguiente fórmula: Ratio = Activo
- Cumplimiento con las obligaciones con la Seguridad Social
- Para las empresas extranjeras, declaración de sometimiento a la legislación española.
- Estar prerregistrado en el ROLECE, y declarar que no ha habido modificaciones en los datos registrados
- Cumplimiento con las obligaciones tributarias
- No prohibición para contratar
- No estar incurso en incompatibilidades
- Capacidad de obrar
The notice only lists the means; the amounts are in the specifications.
Ask the specifications
An AI assistant is answering you. Only from what the specifications say, citing document and page; each citation is checked. Your question is processed outside your device and we do not store it under your name. What governs is the specifications.
EjemploMade-up data so you can see the result. It doesn't belong to any company or person.
Administrative specifications (PCAP) Read
Saved: Administrative specifications (PCAP), 38 pages.
Once the specifications are read, the questions, the compliance matrix and the proposal work from their text.
Sign in with your email: we'll send you a link, no password
We only keep your email to give you access. Privacy
Prepare my bid
The steps, in the order you do them. You submit on the contracting body's platform, not here.
- Decide whether to bid Should I bid?
- Read what they ask for Ask the specifications · Compliance matrix
- Prepare the paperwork Fill in the annexes of the specifications
- Write the technical proposal Guided technical proposal · Simulated evaluator
- Review your bid Review my bid
- Submit it Submit on each platform · Add the deadline to my calendar
How much winners bid below
En 19 contratos de este órgano en el mismo sector (obras), quien ganó bajó una mediana del 5,3 % (half of them between 0,4 % and 9,5 %). With three or more bids, 9,1 %. Only one bid was submitted in 26 % of them. Work out the abnormally low bid threshold.
How many points your reduction scores
We read the price formula in the specifications and apply it to your reduction against the best of the others.
Published by the authority
- Composición de la mesa de contratación
- Memoria justificativa
- Acuerdo de iniciación del expediente
- Documento de aprobación del expediente
- Modelo Oferta económmica
Documents and notices
What Ayuntamiento de Teruel buys and who it awards to · More tenders in Teruel · More tenders: works
Guarantees, payments, appeals and all the data in the notice
Guarantees
Final guarantee: 5 % of the price you bid, excluding VAT. If you bid the base budget, 2.557,31 €; with your reduction, less. It is provided by the bidder with the best offer, before the award.
How it is provided
- Bank guarantee from a bank, savings bank, credit cooperative, financial credit institution or mutual guarantee society: joint and several, waiving the benefit of discussion, payable on first demand and with no end date.
- Surety bond with an insurer authorised in that line.
- Cash or Public Debt securities, at the Caja General de Depósitos (state deposit office) or at the deposit office of the contracting region or local entity.
- Withholding from the price, only if the specifications provide for it.
The final guarantee, as a bank guarantee or surety bond, is deposited at the Caja General de Depósitos or the equivalent deposit office of the contracting administration; the provisional one, as a bank guarantee or surety bond, is handed to the contracting authority.
Check who is vouching for you
Before paying the fee, check that the entity is registered: Bank of Spain register of entities (banks and mutual guarantee societies) or register of insurers of the Directorate-General for Insurance (surety bonds).
Public Sector Contracts Act, articles 106 to 111 (BOE); General Regulation, articles 55 to 59 (BOE); Regulation of the Caja General de Depósitos, article 12 (BOE). Consulted on 7-11-2026. What the specifications of this tender say prevails.
How long it takes to pay
Teruel Town Council paid its suppliers in 15,7 days on average (abril–junio de 2026). Within the 30 days the law sets.
Source of the data: Ministerio de Hacienda, average supplier payment period (RD 635/2014), consulted on 19-11-2026. When you have to be paid and what to do if you are not.
Won it? Find subcontractors
If you win, part of the work can be subcontracted: local companies with similar work and, if the specifications reserve the contract, special employment centres and integration companies. See subcontractors
Your deadlines in working days
Counted using the calendar of the authority's seat: Teruel (Aragón) (Law 39/2015, art. 30).
- If they ask you for the documents (art. 150.2)
- If the request reaches you today, 23/11/2026: 7 working days from the day after Monday 23 November 2026. Expires on Wednesday 2 December 2026.
If the act was published the same day on the contracting authority's profile, the deadline counts from the sending of the notification, not from when you open it (LCSP, Additional Provision 15): always use the earliest date.
There is no public holiday within the period: only Saturdays and Sundays are skipped.
Excluding Saturdays, Sundays and national public holidays. Public holidays of Aragón are also deducted. Local holidays of Teruel are deducted. Any day that the Administration's calendar of non-working days adds (art. 30.6 and 30.7 of Law 39/2015) also extends the period.
Datos de festivos.io — CC BY 4.0 — https://festivos.io. Códigos postales: GeoNames — CC BY 4.0 — https://www.geonames.org.Count another deadline with your calendar (API: since, dias, cp_organo, cp_interesado).
If you are excluded or disagree
This contract is below 3.000.000 € of estimated value: it is not subject to the special appeal. Its acts are appealed under Law 39/2015 and Law 29/1998 on the contentious-administrative jurisdiction (art. 44.6). Before submitting, review your bid so that there is nothing to appeal. Source: LCSP, art. 44: recurso especial en materia de contratación, actos recurribles (consolidated text, accessed on 7 November 2026).
| Contracting authority | Junta de Gobierno Local del Ayuntamiento de Teruel |
|---|---|
| Case reference | 20260002331 |
| Type of contract | Works |
| Procedure | Simplified open |
| Régimen | Ley de Contratos del Sector Público |
| Base budget excluding VAT | 51.146,28 € |
| Base budget including VAT | 61.887,00 € |
| Estimated value | 51.146,28 € |
| Place of performance | Teruel |
| CPV | 45261213 · Colocación de cubiertas metálicas |
| End of the submission period | 14/12/2026 at 23:59 (21 days left) |
| Status | Open for bids |
| Final guarantee | 5,0 % |
Régimen de esta licitación
- Ley de Contratos del Sector Público Ley 9/2017, de Contratos del Sector Público (LCSP)
Contrato regido por la Ley 9/2017.
Origen de los datos: Ministerio de Hacienda (Plataforma de Contratación del Sector Público). Actualizado el 23/11/2026 a las 14:12. No somos una plataforma de contratación: la oferta se presenta en la del órgano.