Adquisición de un mínimo de treinta mantas antiexplosivos, en un período de tres años para la dotación de los policías TEDAX-NRBQ.
Equipo de emergencia y seguridad · Supply contract · Madrid · Lasts 36 months
Should I bid?
To bid you need…
- Submit your bid on the contracting body's platform before 09/12/2026.
- Prove the solvency the notice asks for (further down, under “What they ask for”).
- A technical proposal: the value judgement is 25 % of the points.
What an experienced bidder checks before preparing a bid, with the data behind each point. The decision is yours.
- In favour: 20 days left: there is time for the technical proposal.
- 75 % of the points are decided by figures (the price is worth 75 out of 100); 25 %, by the technical proposal.
- In 61 contracts of this body in the same sector, usually 1 bid is submitted and the winner lowers the price by 14,4 % when there are three bids or more.
- In favour: In 74 % of them there was only one bid: competition is usually low.
- If you win, you have 7 working days to hand in the documents that prove what you declared (art. 159.4 LCSP) and to lodge a performance guarantee of 5 % (up to 4.500 €).
- Simplified open procedure: no provisional guarantee, and you must be registered in ROLECE (art. 159.4.a LCSP).
Award criteria
- Precio · 75,0 points · by formula
- Oferta técnica · 25,0 points · value judgement
Solvency required
- Según apartado 7.2 del Cuadro de Características del PCAP
- Según apartado 7.1 del Cuadro de Características del PCAP
- Cumplimiento con las obligaciones tributarias
- Cumplimiento con las obligaciones con la Seguridad Social
- Capacidad de obrar
- No prohibición para contratar
The notice only lists the means; the amounts are in the specifications.
Short of solvency? Look for a partner for a joint venture (UTE)
In a joint venture (UTE) the solvency of each company is added together. We show you who has won contracts of the same kind for the amount that is missing.
Ask the specifications
An AI assistant is answering you. Only from what the specifications say, citing document and page; each citation is checked. Your question is processed outside your device and we do not store it under your name. What governs is the specifications.
EjemploMade-up data so you can see the result. It doesn't belong to any company or person.
Administrative specifications (PCAP) Read
Saved: Administrative specifications (PCAP), 38 pages.
Once the specifications are read, the questions, the compliance matrix and the proposal work from their text.
Sign in with your email: we'll send you a link, no password
We only keep your email to give you access. Privacy
Prepare my bid
The steps, in the order you do them. You submit on the contracting body's platform, not here.
- Decide whether to bid Should I bid?
- Read what they ask for Ask the specifications · Compliance matrix
- Prepare the paperwork Fill in the annexes of the specifications
- Write the technical proposal Guided technical proposal · Simulated evaluator
- Review your bid Review my bid
- Submit it Submit on each platform · Add the deadline to my calendar
How much winners bid below
En 61 contratos de este órgano en el mismo sector (seguridad, incendios y defensa), quien ganó bajó una mediana del 0,0 % (half of them between 0,0 % and 1,3 %). With three or more bids, 14,4 %. Only one bid was submitted in 74 % of them. Work out the abnormally low bid threshold.
How many points your reduction scores
We read the price formula in the specifications and apply it to your reduction against the best of the others.
Documents and notices
What División Económica y Técnica (Cuerpo Nacional de Policía) buys and who it awards to · More tenders in Madrid · More tenders: security, fire and defence
Guarantees, payments, appeals and all the data in the notice
Guarantees
Final guarantee: 5 % of the price you bid, excluding VAT. If you bid the base budget, 4.500,00 €; with your reduction, less. It is provided by the bidder with the best offer, before the award.
How it is provided
- Bank guarantee from a bank, savings bank, credit cooperative, financial credit institution or mutual guarantee society: joint and several, waiving the benefit of discussion, payable on first demand and with no end date.
- Surety bond with an insurer authorised in that line.
- Cash or Public Debt securities, at the Caja General de Depósitos (state deposit office) or at the deposit office of the contracting region or local entity.
- Withholding from the price, only if the specifications provide for it.
The final guarantee, as a bank guarantee or surety bond, is deposited at the Caja General de Depósitos or the equivalent deposit office of the contracting administration; the provisional one, as a bank guarantee or surety bond, is handed to the contracting authority.
Check who is vouching for you
Before paying the fee, check that the entity is registered: Bank of Spain register of entities (banks and mutual guarantee societies) or register of insurers of the Directorate-General for Insurance (surety bonds).
Public Sector Contracts Act, articles 106 to 111 (BOE); General Regulation, articles 55 to 59 (BOE); Regulation of the Caja General de Depósitos, article 12 (BOE). Consulted on 7-11-2026. What the specifications of this tender say prevails.
Won it? Find subcontractors
If you win, part of the work can be subcontracted: local companies with similar work and, if the specifications reserve the contract, special employment centres and integration companies. See subcontractors
Your deadlines in working days
Counted using the calendar of the authority's seat: Madrid (Comunidad de Madrid) (Law 39/2015, art. 30).
- If they ask you for the documents (art. 150.2)
- If the request reaches you today, 19/11/2026: 7 working days from the day after Thursday 19 November 2026. Expires on Monday 30 November 2026. There is no public holiday within the period: only Saturdays and Sundays are skipped.
Excluding Saturdays, Sundays and national public holidays. Public holidays of Comunidad de Madrid are also deducted. Local holidays of Madrid are deducted. Any day that the Administration's calendar of non-working days adds (art. 30.6 and 30.7 of Law 39/2015) also extends the period.
Datos de festivos.io — CC BY 4.0 — https://festivos.io. Códigos postales: GeoNames — CC BY 4.0 — https://www.geonames.org.Count another deadline with your calendar (API: since, dias, cp_organo, cp_interesado).
If you are excluded or disagree
This contract is below 100.000 € of estimated value: it is not subject to the special appeal. Its acts are appealed under Law 39/2015 and Law 29/1998 on the contentious-administrative jurisdiction (art. 44.6). Before submitting, review your bid so that there is nothing to appeal. Source: LCSP, art. 44: recurso especial en materia de contratación, actos recurribles (consolidated text, accessed on 7 November 2026).
| Contracting authority | División Económica y Técnica (Cuerpo Nacional de Policía) |
|---|---|
| Case reference | Z27IM001/N10 |
| Type of contract | Supplies |
| Procedure | Simplified open |
| Régimen | Defensa y seguridad |
| Base budget excluding VAT | 90.000,00 € |
| Base budget including VAT | 108.900,00 € |
| Estimated value | 90.000,00 € |
| Place of performance | Madrid |
| CPV | 35100000 · Equipo de emergencia y seguridad |
| End of the submission period | 09/12/2026 at 12:00 (20 days left) |
| Status | Open for bids |
| Final guarantee | 5,0 % |
Régimen de esta licitación
- Defensa y seguridad Ley 24/2011, de contratos del sector público en los ámbitos de la defensa y de la seguridad
Contrato regido por la ley de defensa y seguridad: sus procedimientos y requisitos de seguridad son propios.
Origen de los datos: Ministerio de Hacienda (Plataforma de Contratación del Sector Público). Actualizado el 18/11/2026 a las 10:31. No somos una plataforma de contratación: la oferta se presenta en la del órgano.