Skip to content
AIM PAPYRSign inMenu
Tenders · Huelva

Servicio redacción Proyecto de Obra Evacuación Pluviales Cuenca Norte y Sur

Servicios de arquitectura, ingeniería y planificación · Services contract · Huelva · Lasts 3 months

Submission deadline15 days leftuntil 04/12/2026 at 14:00
Base budget excluding VAT327.302,30 €estimated value 327.320,30 €
Contracting authorityAlcaldía del Ayuntamiento de Puebla de GuzmánProcedure: Open
Specifications Administrative clauses specification · Technical specifications (they open on the Platform, in a new tab)

Are you going to bid? We email you if the deadline or the specifications change, a new document comes out, or it is cancelled or awarded.

Prepare my bid

Should I bid?

To bid you need…

What an experienced bidder checks before preparing a bid, with the data behind each point. The decision is yours.

Award criteria

Solvency required

The notice only lists the means; the amounts are in the specifications.

Short of solvency? Look for a partner for a joint venture (UTE)

In a joint venture (UTE) the solvency of each company is added together. We show you who has won contracts of the same kind for the amount that is missing.

Ask the specifications

An AI assistant is answering you. Only from what the specifications say, citing document and page; each citation is checked. Your question is processed outside your device and we do not store it under your name. What governs is the specifications.

Prepare my bid

  1. Find
  2. Decide
  3. Prepare
  4. Submit
  5. After winning

The steps, in the order you do them. You submit on the contracting body's platform, not here.

  1. Decide whether to bid Should I bid?
  2. Read what they ask for Ask the specifications · Compliance matrix
  3. Prepare the paperwork Fill in the annexes of the specifications
  4. Write the technical proposal Guided technical proposal · Simulated evaluator
  5. Review your bid Review my bid
  6. Submit it Submit on each platform · Add the deadline to my calendar

How much winners bid below

En 8.135 contratos parecidos (servicios de arquitectura y servicios conexos), quien ganó bajó una mediana del 19,0 % (half of them between 5,9 % and 29,3 %). With three or more bids, 24,9 %. Only one bid was submitted in 28 % of them. Work out the abnormally low bid threshold.

How many points your reduction scores

We read the price formula in the specifications and apply it to your reduction against the best of the others.

Documents and notices

What Ayuntamiento de Puebla de Guzmán buys and who it awards to · More tenders in Huelva · More tenders: architecture and engineering

Guarantees, payments, appeals and all the data in the notice

Guarantees

Final guarantee: 5 % of the price you bid, excluding VAT. If you bid the base budget, 16.365,12 €; with your reduction, less. It is provided by the bidder with the best offer, before the award.

How it is provided

  • Bank guarantee from a bank, savings bank, credit cooperative, financial credit institution or mutual guarantee society: joint and several, waiving the benefit of discussion, payable on first demand and with no end date.
  • Surety bond with an insurer authorised in that line.
  • Cash or Public Debt securities, at the Caja General de Depósitos (state deposit office) or at the deposit office of the contracting region or local entity.
  • Withholding from the price, only if the specifications provide for it.

The final guarantee, as a bank guarantee or surety bond, is deposited at the Caja General de Depósitos or the equivalent deposit office of the contracting administration; the provisional one, as a bank guarantee or surety bond, is handed to the contracting authority.

Check who is vouching for you

Before paying the fee, check that the entity is registered: Bank of Spain register of entities (banks and mutual guarantee societies) or register of insurers of the Directorate-General for Insurance (surety bonds).

Public Sector Contracts Act, articles 106 to 111 (BOE); General Regulation, articles 55 to 59 (BOE); Regulation of the Caja General de Depósitos, article 12 (BOE). Consulted on 7-11-2026. What the specifications of this tender say prevails.

How long it takes to pay

Puebla de Guzmán Town Council paid its suppliers in 31,3 days on average (abril–junio de 2026). That is above the 30 days the law sets: expect to be paid later, and factor the late-payment interest into your bid.

Source of the data: Ministerio de Hacienda, average supplier payment period (RD 635/2014), consulted on 19-11-2026. When you have to be paid and what to do if you are not.

Won it? Find subcontractors

If you win, part of the work can be subcontracted: local companies with similar work and, if the specifications reserve the contract, special employment centres and integration companies. See subcontractors

Minimum staff cost under the collective agreement

In services, staff cost sets the minimum price you can bid. Choose the collective agreement, enter its pay scale and check whether your bid covers it (art. 149.4 LCSP). Work out the staff cost

Your deadlines in working days

Counted using the calendar of the authority's seat: Puebla de Guzmán (Andalucía) (Law 39/2015, art. 30).

Recurrir el anuncio o los pliegos
Notice published on 19/11/2026: 15 working days from the day after Thursday 19 November 2026. Expires on Monday 14 December 2026. Si recurres los pliegos, hazlo antes de presentar tu oferta (art. 50.1.b).

Skipped, besides weekends:

  • 07/12/2026 · Lunes siguiente a Día de la Constitución Española regional holiday, Andalucía
  • 08/12/2026 · Immaculate Conception national holiday
If they ask you for the documents (art. 150.2)
If the request reaches you today, 19/11/2026: 10 working days from the day after Thursday 19 November 2026. Expires on Thursday 3 December 2026. There is no public holiday within the period: only Saturdays and Sundays are skipped.

Excluding Saturdays, Sundays and national public holidays. Public holidays of Andalucía are also deducted. Local holidays of Puebla de Guzmán are deducted. Any day that the Administration's calendar of non-working days adds (art. 30.6 and 30.7 of Law 39/2015) also extends the period.

Datos de festivos.io — CC BY 4.0 — https://festivos.io. Códigos postales: GeoNames — CC BY 4.0 — https://www.geonames.org.

Count another deadline with your calendar (API: since, dias, cp_organo, cp_interesado).

If you are excluded or disagree

If something in the notice or the specifications prevents you from bidding, or if the committee leaves out your bid, you can go for free before a specialised tribunal: the special appeal on procurement, which is voluntary (art. 44.7).

What you can appeal
  • The tender notice, the specifications and the contract documents.
  • Procedural acts that decide on the award, prevent continuing or leave a party defenceless; in any case, the admission or rejection of candidates and bidders and the admission or exclusion of bids, including those excluded as abnormally low (art. 149).
  • The award decision.
  • Certain contract modifications (arts. 204 and 205), assignments to in-house bodies and concession buy-backs.
Source: LCSP, art. 44: recurso especial en materia de contratación, actos recurribles (consolidated text, accessed on 7 November 2026).
Before which tribunal
Tribunal Administrativo de Recursos Contractuales de la Junta de Andalucía (TARCJA). For local entities the rule of their region applies (art. 46.4): the notice of the act tells you which tribunal covers your town council or provincial council. Source: LCSP, art. 46: órgano competente en las comunidades autónomas y entidades locales (consolidated text, accessed on 7 November 2026).
Deadline
15 working days (art. 50.1). They are counted from the day after: the publication of the notice, for the notice and for the specifications (if the notice says how to access them); the day you learned of the act, for procedural acts such as an exclusion; the notification of the award. If you want to appeal the specifications, do so before submitting your bid (art. 50.1.b). The period keeps running while you ask to see the file (art. 52.2). Appealing the award suspends the procedure (art. 53). The appeal can be filed at the contracting authority's registry or at the tribunal's (art. 51.3).Source: LCSP, art. 50: iniciación del procedimiento y plazo (consolidated text, accessed on 7 November 2026).
Applicable case law

Everything about the special appeal · Review your bid before submitting it

Contracting authorityAlcaldía del Ayuntamiento de Puebla de Guzmán
Case reference010/2026
Type of contractServices
ProcedureOpen
RégimenLey de Contratos del Sector Público; Regulación armonizada
Base budget excluding VAT327.302,30 €
Base budget including VAT396.057,56 €
Estimated value327.320,30 €
Place of performanceHuelva
CPV71240000 · Servicios de arquitectura, ingeniería y planificación; 71520000 · Servicios de supervisión de obras
End of the submission period04/12/2026 at 14:00 (15 days left)
StatusOpen for bids
Final guarantee5,0 %

Régimen de esta licitación

Origen de los datos: Ministerio de Hacienda (Plataforma de Contratación del Sector Público). Actualizado el 19/11/2026 a las 12:23. No somos una plataforma de contratación: la oferta se presenta en la del órgano.