T-898. Dirección de obras, asistencia técnica a la dirección de obra y apoyo al servicio de Construcción y Control de Calidad para las obras del Área de Carreteras de la Diputación de Valencia (2027 2029)
Servicios de ingeniería · Services contract · Valencia/València · Lasts 24 months · 3 lots
Should I bid?
To bid you need…
- Submit your bid on the contracting body's platform before 23/12/2026.
- Prove the solvency the notice asks for (further down, under “What they ask for”).
- A technical proposal: the value judgement is 45 % of the points.
What an experienced bidder checks before preparing a bid, with the data behind each point. The decision is yours.
- In favour: 34 days left: there is time for the technical proposal.
- 55 % of the points are decided by figures (the price is worth 45 out of 100); 45 %, by the technical proposal.
- In 59 contracts of this body in the same sector, usually 5 bids are submitted and the winner lowers the price by 18,2 % when there are three bids or more.
- If you win, you have 10 working days to hand in the documents that prove what you declared (art. 150.2 LCSP) and to lodge a performance guarantee of 5 % (up to 79.525 €).
- Subject to harmonised regulation: it is also published in the OJEU and a special appeal is possible.
- In favour: 3 lots: you can bid only for those that fit (check whether the specifications limit how many one company can win).
Lots
- 1. LOTE 1: T-898/L1. Dirección de obras, Asistencia técnica a la Dirección de obra y Apoyo al Servicio de Construcción y Control de Calidad para las obras del Área de Carreteras de la Diputación de Valencia (2027 2029). Demarcaciones de Serra y Villar del Arzobispo. · 431.150,00 € excl. VAT
- 2. LOTE 2: T-898/L2. Dirección de obras, Asistencia técnica a la Dirección de obra y Apoyo al Servicio de Construcción y Control de Calidad para las obras del Área de Carreteras de la Diputación de Valencia (2027 2029). Demarcaciones de Alzira y Buñol. · 667.650,00 € excl. VAT
- 3. LOTE 3: T-898/L3. Dirección de obras, Asistencia técnica a la Dirección de obra y Apoyo al Servicio de Construcción y Control de Calidad para las obras del Área de Carreteras de la Diputación de Valencia (2027 2029). Demarcaciones de Alcudia y Requena. · 491.700,00 € excl. VAT
Award criteria
- 2. Mejoras. Experiencia adicional del equipo propuesto · 10,0 points · by formula
- 3. Memoria técnica · 45,0 points · value judgement
- 1. Oferta económica · 45,0 points · by formula
Solvency required
- Haber ejecutado en los últimos tres años anteriores a la fecha de finalización del plazo de presentación de proposiciones, servicios y trabajos de Dirección de obra y de asistencia técnica para las obras, o de similar naturaleza que incluyan trabajos de entre los previstos en el Pliego de Prescripc
- El volumen anual de negocios de la empresa, referido al mejor ejercicio dentro de los tres últimos disponibles en función de las fechas de constitución o de inicio de las actividades del empresario, deberá ser igual o superior al 25 por 100 del Valor Estimado del contrato de lote correspondiente, as
- No estar incurso en incompatibilidades
- Cumplimiento con las obligaciones con la Seguridad Social
- Capacidad de obrar
- Cumplimiento con las obligaciones tributarias
- No prohibición para contratar
The notice only lists the means; the amounts are in the specifications.
Short of solvency? Look for a partner for a joint venture (UTE)
In a joint venture (UTE) the solvency of each company is added together. We show you who has won contracts of the same kind for the amount that is missing.
Ask the specifications
An AI assistant is answering you. Only from what the specifications say, citing document and page; each citation is checked. Your question is processed outside your device and we do not store it under your name. What governs is the specifications.
EjemploMade-up data so you can see the result. It doesn't belong to any company or person.
Administrative specifications (PCAP) Read
Saved: Administrative specifications (PCAP), 38 pages.
Once the specifications are read, the questions, the compliance matrix and the proposal work from their text.
Sign in with your email: we'll send you a link, no password
We only keep your email to give you access. Privacy
Prepare my bid
The steps, in the order you do them. You submit on the contracting body's platform, not here.
- Decide whether to bid Should I bid?
- Read what they ask for Ask the specifications · Compliance matrix
- Prepare the paperwork Fill in the annexes of the specifications
- Write the technical proposal Guided technical proposal · Simulated evaluator
- Review your bid Review my bid
- Submit it Submit on each platform · Add the deadline to my calendar
How much winners bid below
En 59 contratos de este órgano en el mismo sector (arquitectura e ingeniería), quien ganó bajó una mediana del 17,0 % (half of them between 0,0 % and 18,9 %). With three or more bids, 18,2 %. Only one bid was submitted in 25 % of them. Work out the abnormally low bid threshold.
How many points your reduction scores
We read the price formula in the specifications and apply it to your reduction against the best of the others.
Published by the authority
- Documento de aprobación del expediente
- Informe necesidad e idoneidad
- PPTP
- Aviso correos fraudulentos
- Composición de la mesa de contratación
- Aviso adjudicatario
- Informe justificativo procedimiento
- Aviso estafa suplantación identidad
- PCAP
Documents and notices
What Diputación Provincial de Valencia buys and who it awards to · More tenders in Valencia · More tenders: architecture and engineering
Guarantees, payments, appeals and all the data in the notice
Guarantees
Final guarantee: 5 % of the price you bid, excluding VAT. If you bid the base budget, 79.525,00 €; with your reduction, less. It is provided by the bidder with the best offer, before the award.
How it is provided
- Bank guarantee from a bank, savings bank, credit cooperative, financial credit institution or mutual guarantee society: joint and several, waiving the benefit of discussion, payable on first demand and with no end date.
- Surety bond with an insurer authorised in that line.
- Cash or Public Debt securities, at the Caja General de Depósitos (state deposit office) or at the deposit office of the contracting region or local entity.
- Withholding from the price, only if the specifications provide for it.
The final guarantee, as a bank guarantee or surety bond, is deposited at the Caja General de Depósitos or the equivalent deposit office of the contracting administration; the provisional one, as a bank guarantee or surety bond, is handed to the contracting authority.
Check who is vouching for you
Before paying the fee, check that the entity is registered: Bank of Spain register of entities (banks and mutual guarantee societies) or register of insurers of the Directorate-General for Insurance (surety bonds).
Public Sector Contracts Act, articles 106 to 111 (BOE); General Regulation, articles 55 to 59 (BOE); Regulation of the Caja General de Depósitos, article 12 (BOE). Consulted on 7-11-2026. What the specifications of this tender say prevails.
How long it takes to pay
Diputación Prov. de Valencia (provincial council) paid its suppliers in 10,1 days on average (abril–junio de 2026). Within the 30 days the law sets.
Source of the data: Ministerio de Hacienda, average supplier payment period (RD 635/2014), consulted on 19-11-2026. When you have to be paid and what to do if you are not.
Won it? Find subcontractors
If you win, part of the work can be subcontracted: local companies with similar work and, if the specifications reserve the contract, special employment centres and integration companies. See subcontractors
Minimum staff cost under the collective agreement
In services, staff cost sets the minimum price you can bid. Choose the collective agreement, enter its pay scale and check whether your bid covers it (art. 149.4 LCSP). Work out the staff cost
Your deadlines in working days
Counted using the calendar of the authority's seat: València (Comunitat Valenciana) (Law 39/2015, art. 30).
- Recurrir el anuncio o los pliegos
- Notice published on 19/11/2026: 15 working days from the day after Thursday 19 November 2026. Expires on Friday 11 December 2026. Si recurres los pliegos, hazlo antes de presentar tu oferta (art. 50.1.b).
Skipped, besides weekends:
- 08/12/2026 · Immaculate Conception national holiday
- If they ask you for the documents (art. 150.2)
- If the request reaches you today, 19/11/2026: 10 working days from the day after Thursday 19 November 2026. Expires on Thursday 3 December 2026. There is no public holiday within the period: only Saturdays and Sundays are skipped.
Excluding Saturdays, Sundays and national public holidays. Public holidays of Comunitat Valenciana are also deducted. Local holidays of València are deducted. Any day that the Administration's calendar of non-working days adds (art. 30.6 and 30.7 of Law 39/2015) also extends the period.
Datos de festivos.io — CC BY 4.0 — https://festivos.io. Códigos postales: GeoNames — CC BY 4.0 — https://www.geonames.org.Count another deadline with your calendar (API: since, dias, cp_organo, cp_interesado).
If you are excluded or disagree
If something in the notice or the specifications prevents you from bidding, or if the committee leaves out your bid, you can go for free before a specialised tribunal: the special appeal on procurement, which is voluntary (art. 44.7).
- What you can appeal
- The tender notice, the specifications and the contract documents.
- Procedural acts that decide on the award, prevent continuing or leave a party defenceless; in any case, the admission or rejection of candidates and bidders and the admission or exclusion of bids, including those excluded as abnormally low (art. 149).
- The award decision.
- Certain contract modifications (arts. 204 and 205), assignments to in-house bodies and concession buy-backs.
- Before which tribunal
- Tribunal Administrativo Central de Recursos Contractuales (TACRC): Comunitat Valenciana le tiene atribuidos sus recursos por convenio (art. 46.2). Source: Real Decreto 561/2026, de 8 de julio, que crea una vocalía en el TACRC (BOE núm. 166) (9 July 2026).
- Deadline
- 15 working days (art. 50.1). They are counted from the day after: the publication of the notice, for the notice and for the specifications (if the notice says how to access them); the day you learned of the act, for procedural acts such as an exclusion; the notification of the award. If you want to appeal the specifications, do so before submitting your bid (art. 50.1.b). The period keeps running while you ask to see the file (art. 52.2). Appealing the award suspends the procedure (art. 53). The appeal can be filed at the contracting authority's registry or at the tribunal's (art. 51.3).Source: LCSP, art. 50: iniciación del procedimiento y plazo (consolidated text, accessed on 7 November 2026).
- Applicable case law
- What is appealed and how long it takes. In 2025 the TACRC received 2.226 appeals (in 2024, 1.824). The award was appealed in 43,58 % of cases, the specifications in 25,18 % and the exclusion in 19,99 %. 15,85 % of appeals were upheld in full and 6,59 % in part; 46,95 % were dismissed and 30,64 % ended without a ruling on the merits. The average time to decide was 55 calendar days (in 2024, 46), counted from when the Tribunal has the file. Source: Memoria 2025 del Tribunal Administrativo Central de Recursos Contractuales (financial year 2025, pp. 14 and 17).
- OIReScon. The 2025 annual supervision report asks for attention to exclusions for bids deemed abnormal and to formal grounds for exclusion. Source: Informe anual de supervisión 2025 de la OIReScon: conclusiones y recomendaciones (approved on 22 December 2025). Source: Buscador de informes consultivos (OIReScon) (accessed on 7 November 2026).
- Junta Consultiva de Contratación Pública del Estado. Before leaving you out for a defect in the documents of the request (art. 150.2), they must give you a chance to correct it if it is not an absolute breach and the requirement already existed when the deadline expired. Source: Junta Consultiva de Contratación Pública del Estado, expediente 6/2021 (art. 150.2 LCSP) (file 6/2021). Source: Informes de la Junta Consultiva de Contratación Pública del Estado (accessed on 7 November 2026).
- Rulings and judgments. Search the TACRC decisions, case law on the CENDOJ. Where to look for those of your region's tribunal.
Everything about the special appeal · Review your bid before submitting it
| Contracting authority | Presidencia de la Diputación Provincial de Valencia |
|---|---|
| Case reference | 1464/26/CAR |
| Type of contract | Services |
| Procedure | Open |
| Régimen | Ley de Contratos del Sector Público; Regulación armonizada |
| Base budget excluding VAT | 1.590.500,00 € |
| Base budget including VAT | 1.924.505,00 € |
| Estimated value | 3.181.000,00 € |
| Place of performance | Valencia/València |
| CPV | 71300000 · Servicios de ingeniería |
| End of the submission period | 23/12/2026 at 13:00 (34 days left) |
| Status | Open for bids |
| Final guarantee | 5,0 % |
Régimen de esta licitación
- Ley de Contratos del Sector Público Ley 9/2017, de Contratos del Sector Público (LCSP)
Contrato regido por la Ley 9/2017. - Regulación armonizada Art. 19 de la Ley 9/2017
Supera el umbral europeo: el anuncio también sale en el Diario Oficial de la UE, y el DEUC y los plazos mínimos son los de la UE.
Origen de los datos: Ministerio de Hacienda (Plataforma de Contratación del Sector Público). Actualizado el 19/11/2026 a las 13:30. No somos una plataforma de contratación: la oferta se presenta en la del órgano.