Servicio de implantación y soporte de una solución de software para la gestión y control de las inversiones de capital privado de la Sociedad Española para la Transformación Tecnológica, E.P.E. (SETT)
Servicios de suministro de software · Services contract · Madrid · Lasts 24 months
Should I bid?
To bid you need…
- Submit your bid on the contracting body's platform before 21/12/2026.
- Prove the solvency the notice asks for (further down, under “What they ask for”).
- A technical proposal: the value judgement is 25 % of the points.
What an experienced bidder checks before preparing a bid, with the data behind each point. The decision is yours.
- In favour: 32 days left: there is time for the technical proposal.
- 75 % of the points are decided by figures (the price is worth 51 out of 100); 25 %, by the technical proposal.
- In 13.731 similar contracts, usually 1 bid is submitted and the winner lowers the price by 17,9 % when there are three bids or more.
- In favour: In 63 % of them there was only one bid: competition is usually low.
- It may currently be provided by PENINSULA CORPORATE INNOVATION SL (a similar contract of the same body, awarded on 14/11/2025, it ends on 05/12/2027): check it in the specifications.
- If you win, you have 10 working days to hand in the documents that prove what you declared (art. 150.2 LCSP) and to lodge a performance guarantee of 5 % (up to 8.750 €).
- Subject to harmonised regulation: it is also published in the OJEU and a special appeal is possible.
Award criteria
- Oferta Económica (Precio) · 51,0 points · by formula
- Memoria Técnica · 25,0 points · value judgement
- Usuarios adicionales sin coste · 8,0 points · by formula
- Certificación en el Esquema Nacional de Seguridad (ENS) · 5,0 points · by formula
- Horas adicionales de formación sin coste · 3,0 points · by formula
- Horas de parametrización sin coste · 8,0 points · by formula
Solvency required
- ANEXO I.B. DECLARACIÓN RESPONSABLE MÚLTIPLE Adscribir un Coordinador del servicio (titulación universitaria o experiencia mínima de 5 años en plataformas CRM SaaS) y personal técnico (experiencia mínima de 3 años). (Apartado 22 del Cuadro Resumen del PCAP)
- Apartado 22 del Cuadro Resumen: Aportar Certificación ISO/IEC 27001 o equivalente.
- Apartado 19 del Cuadro Resumen: Experiencia en los últimos tres (3) años en la prestación de servicios relacionados con la implantación, configuración, parametrización, integración, mantenimiento evolutivo y soporte de plataformas CRM en modalidad SaaS. Importe mínimo exigido: 61.250,00 EUR. A
- Apartado 18 del Cuadro Resumen: Volumen anual de negocios referido al mejor ejercicio dentro de los tres últimos disponibles, en función de las fechas de constitución o de inicio de actividades del empresario, por importe igual o superior a una vez y media el valor anual medio del contrato. Im
- No estar incurso en incompatibilidades
- Cumplimiento con las obligaciones con la Seguridad Social
- Capacidad de obrar
- Cumplimiento con las obligaciones tributarias
- No prohibición para contratar
The notice only lists the means; the amounts are in the specifications.
Short of solvency? Look for a partner for a joint venture (UTE)
In a joint venture (UTE) the solvency of each company is added together. We show you who has won contracts of the same kind for the amount that is missing.
Ask the specifications
An AI assistant is answering you. Only from what the specifications say, citing document and page; each citation is checked. Your question is processed outside your device and we do not store it under your name. What governs is the specifications.
EjemploMade-up data so you can see the result. It doesn't belong to any company or person.
Administrative specifications (PCAP) Read
Saved: Administrative specifications (PCAP), 38 pages.
Once the specifications are read, the questions, the compliance matrix and the proposal work from their text.
Sign in with your email: we'll send you a link, no password
We only keep your email to give you access. Privacy
Prepare my bid
The steps, in the order you do them. You submit on the contracting body's platform, not here.
- Decide whether to bid Should I bid?
- Read what they ask for Ask the specifications · Compliance matrix
- Prepare the paperwork Fill in the annexes of the specifications
- Write the technical proposal Guided technical proposal · Simulated evaluator
- Review your bid Review my bid
- Submit it Submit on each platform · Add the deadline to my calendar
Quién puede estar prestándolo
El mismo órgano adjudicó un contrato del mismo sector, con un objeto parecido y de un importe del mismo orden, que sigue vivo o acaba de vencer:
- PENINSULA CORPORATE INNOVATION SL · 93.827,32 € sin IVA · adjudicado el 14/11/2025 · vence el 05/12/2027
Servicio de implantación y soporte en modalidad SAAS de un software para gestionar y controlar las inversiones de capital privado. (expediente 2025/03/E/INV CRM.2)
Lo deducimos de las adjudicaciones publicadas; comprueba en el pliego que es el mismo servicio.
How much winners bid below
En 13.731 contratos parecidos (servicios de programación de software y de consultoría), quien ganó bajó una mediana del 1,4 % (half of them between 0,0 % and 15,0 %). With three or more bids, 17,9 %. Only one bid was submitted in 63 % of them. Work out the abnormally low bid threshold.
Comparable awards
En 1074 contratos basados en acuerdos marco parecidos, el importe adjudicado sin IVA tiene una mediana de 181.888,00 € (la mitad, entre 66.735,85 € y 460.762,35 €).
- Prórroga del contrato A1525/2025. Servicios de pruebas de software sobre el módulo de soporte a la gestión del Plan de Recuperación, Transformación y Resilienci · 172.758,30 € · AXPE Consulting S.L. · 2026-04-22
- Suministro de derechos de uso y actualización de licencias de software para la administración y gestión de bases de datos · 170.611,51 € · INETUM ESPAÑA, S.A. · 2026-06-23
- Suscripción de licencias software para la gestión del trabajo y gestión de servicios TI en el Ministerio de Sanidad · 181.998,50 € · Aplicaciones y Tratamientos de Sistemas, S.A · 2026-03-12
- Renovación de licencias del software de gestión de contenidos web del Ministerio de Agricultura, Pesca y Alimentación. · 171.461,69 € · UTE VASS T4S (L5 SDA 25/2022) · 2026-03-31
- Servicio de asistencia técnica para el soporte al mantenimiento para aplicaciones de transformación digital · 184.790,48 € · Ute Global Rosetta, S.L.U. y Connectis ICT · 2025-07-28
Son contratos basados en acuerdos marco de la compra centralizada del Estado, con precios y empresas ya fijados por el acuerdo: sirven de referencia de precio, no son licitaciones abiertas. Se comparan por el CPV de esta licitación y por las palabras del título; el feed no trae CPV. La baja solo se calcula con los contratos que traen presupuesto. Origen de los datos: Dirección General de Racionalización y Centralización de la Contratación – Ministerio de Hacienda.
How many points your reduction scores
We read the price formula in the specifications and apply it to your reduction against the best of the others.
Published by the authority
- Informe de insuficiencia de medios
- Memoria justificativa
- Informe de insuficiencia de medios
- Acuerdo de iniciación del expediente
- Memoria justificativa
Documents and notices
What Dirección General de la Sociedad Española para la Transformación Tecnológica, E.P.E. buys and who it awards to · More tenders in Madrid · More tenders: iT and IT consulting · More tenders: software
Guarantees, payments, appeals and all the data in the notice
Guarantees
Final guarantee: 5 % of the price you bid, excluding VAT. If you bid the base budget, 8.750,00 €; with your reduction, less. It is provided by the bidder with the best offer, before the award.
How it is provided
- Bank guarantee from a bank, savings bank, credit cooperative, financial credit institution or mutual guarantee society: joint and several, waiving the benefit of discussion, payable on first demand and with no end date.
- Surety bond with an insurer authorised in that line.
- Cash or Public Debt securities, at the Caja General de Depósitos (state deposit office) or at the deposit office of the contracting region or local entity.
- Withholding from the price, only if the specifications provide for it.
The final guarantee, as a bank guarantee or surety bond, is deposited at the Caja General de Depósitos or the equivalent deposit office of the contracting administration; the provisional one, as a bank guarantee or surety bond, is handed to the contracting authority.
Check who is vouching for you
Before paying the fee, check that the entity is registered: Bank of Spain register of entities (banks and mutual guarantee societies) or register of insurers of the Directorate-General for Insurance (surety bonds).
Public Sector Contracts Act, articles 106 to 111 (BOE); General Regulation, articles 55 to 59 (BOE); Regulation of the Caja General de Depósitos, article 12 (BOE). Consulted on 7-11-2026. What the specifications of this tender say prevails.
Won it? Find subcontractors
If you win, part of the work can be subcontracted: local companies with similar work and, if the specifications reserve the contract, special employment centres and integration companies. See subcontractors
Minimum staff cost under the collective agreement
In services, staff cost sets the minimum price you can bid. Choose the collective agreement, enter its pay scale and check whether your bid covers it (art. 149.4 LCSP). Work out the staff cost
Your deadlines in working days
Counted using the calendar of the authority's seat: Madrid (Comunidad de Madrid) (Law 39/2015, art. 30).
- Recurrir el anuncio o los pliegos
- Notice published on 19/11/2026: 15 working days from the day after Thursday 19 November 2026. Expires on Monday 14 December 2026. Si recurres los pliegos, hazlo antes de presentar tu oferta (art. 50.1.b).
Skipped, besides weekends:
- 07/12/2026 · Lunes siguiente a Día de la Constitución Española regional holiday, Comunidad de Madrid
- 08/12/2026 · Immaculate Conception national holiday
- If they ask you for the documents (art. 150.2)
- If the request reaches you today, 19/11/2026: 10 working days from the day after Thursday 19 November 2026. Expires on Thursday 3 December 2026. There is no public holiday within the period: only Saturdays and Sundays are skipped.
Excluding Saturdays, Sundays and national public holidays. Public holidays of Comunidad de Madrid are also deducted. Local holidays of Madrid are deducted. Any day that the Administration's calendar of non-working days adds (art. 30.6 and 30.7 of Law 39/2015) also extends the period.
Datos de festivos.io — CC BY 4.0 — https://festivos.io. Códigos postales: GeoNames — CC BY 4.0 — https://www.geonames.org.Count another deadline with your calendar (API: since, dias, cp_organo, cp_interesado).
If you are excluded or disagree
If something in the notice or the specifications prevents you from bidding, or if the committee leaves out your bid, you can go for free before a specialised tribunal: the special appeal on procurement, which is voluntary (art. 44.7).
- What you can appeal
- The tender notice, the specifications and the contract documents.
- Procedural acts that decide on the award, prevent continuing or leave a party defenceless; in any case, the admission or rejection of candidates and bidders and the admission or exclusion of bids, including those excluded as abnormally low (art. 149).
- The award decision.
- Certain contract modifications (arts. 204 and 205), assignments to in-house bodies and concession buy-backs.
- Before which tribunal
- It depends on the administration the contracting authority belongs to: the TACRC if it is a State one (art. 45) and the region's tribunal if it is regional or local (art. 46). See the table of tribunals. Source: LCSP, art. 46: órgano competente en las comunidades autónomas y entidades locales (consolidated text, accessed on 7 November 2026).
- Deadline
- 15 working days (art. 50.1). They are counted from the day after: the publication of the notice, for the notice and for the specifications (if the notice says how to access them); the day you learned of the act, for procedural acts such as an exclusion; the notification of the award. If you want to appeal the specifications, do so before submitting your bid (art. 50.1.b). The period keeps running while you ask to see the file (art. 52.2). Appealing the award suspends the procedure (art. 53). The appeal can be filed at the contracting authority's registry or at the tribunal's (art. 51.3).Source: LCSP, art. 50: iniciación del procedimiento y plazo (consolidated text, accessed on 7 November 2026).
- Applicable case law
- What is appealed and how long it takes. In 2025 the TACRC received 2.226 appeals (in 2024, 1.824). The award was appealed in 43,58 % of cases, the specifications in 25,18 % and the exclusion in 19,99 %. 15,85 % of appeals were upheld in full and 6,59 % in part; 46,95 % were dismissed and 30,64 % ended without a ruling on the merits. The average time to decide was 55 calendar days (in 2024, 46), counted from when the Tribunal has the file. Source: Memoria 2025 del Tribunal Administrativo Central de Recursos Contractuales (financial year 2025, pp. 14 and 17).
- OIReScon. The 2025 annual supervision report asks for attention to exclusions for bids deemed abnormal and to formal grounds for exclusion. Source: Informe anual de supervisión 2025 de la OIReScon: conclusiones y recomendaciones (approved on 22 December 2025). Source: Buscador de informes consultivos (OIReScon) (accessed on 7 November 2026).
- Junta Consultiva de Contratación Pública del Estado. Before leaving you out for a defect in the documents of the request (art. 150.2), they must give you a chance to correct it if it is not an absolute breach and the requirement already existed when the deadline expired. Source: Junta Consultiva de Contratación Pública del Estado, expediente 6/2021 (art. 150.2 LCSP) (file 6/2021). Source: Informes de la Junta Consultiva de Contratación Pública del Estado (accessed on 7 November 2026).
- Rulings and judgments. Search the TACRC decisions, case law on the CENDOJ. Where to look for those of your region's tribunal.
Everything about the special appeal · Review your bid before submitting it
| Contracting authority | Dirección General de la Sociedad Española para la Transformación Tecnológica, E.P.E. |
|---|---|
| Case reference | 2026-15-SEGUIMIENTO-CRM |
| Type of contract | Services |
| Procedure | Open |
| Régimen | Ley de Contratos del Sector Público; Regulación armonizada |
| Base budget excluding VAT | 175.000,00 € |
| Base budget including VAT | 211.750,00 € |
| Estimated value | 305.000,00 € |
| Place of performance | Madrid |
| CPV | 72268000 · Servicios de suministro de software; 72267100 · Mantenimiento de software de tecnología de la información; 72263000 · Servicios de implementación de software; 48400000 · Paquetes de software de transacciones comerciales y personales; 48311000 · Paquetes de software de gestión de documentos; 72261000 · Servicios de apoyo al software |
| End of the submission period | 21/12/2026 at 12:00 (32 days left) |
| Status | Open for bids |
| Final guarantee | 5,0 % |
Régimen de esta licitación
- Ley de Contratos del Sector Público Ley 9/2017, de Contratos del Sector Público (LCSP)
Contrato regido por la Ley 9/2017. - Regulación armonizada Art. 19 de la Ley 9/2017
Supera el umbral europeo: el anuncio también sale en el Diario Oficial de la UE, y el DEUC y los plazos mínimos son los de la UE.
Origen de los datos: Ministerio de Hacienda (Plataforma de Contratación del Sector Público). Actualizado el 19/11/2026 a las 16:32. No somos una plataforma de contratación: la oferta se presenta en la del órgano.