actuaciones de transición digital y de competitividad así como acciones de apoyo y asistencia técnica Ejes 3 y 4 PSTD
Servicios de desarrollo de software · Services contract · Madrid · Lasts 9 months · 4 lots
Should I bid?
To bid you need…
- Submit your bid on the contracting body's platform before 17/12/2026.
- Prove the solvency the notice asks for (further down, under “What they ask for”).
- A technical proposal: the value judgement is 30 % of the points.
What an experienced bidder checks before preparing a bid, with the data behind each point. The decision is yours.
- In favour: 22 days left: there is time for the technical proposal.
- 70 % of the points are decided by figures (the price is worth 45 out of 100); 30 %, by the technical proposal.
- In 13.819 similar contracts, usually 1 bid is submitted and the winner lowers the price by 18 % when there are three bids or more.
- In favour: In 63 % of them there was only one bid: competition is usually low.
- If you win, you have 10 working days to hand in the documents that prove what you declared (art. 150.2 LCSP) and to lodge a performance guarantee of 5 % (up to 17.583 €).
- Subject to harmonised regulation: it is also published in the OJEU and a special appeal is possible.
- In favour: 4 lots: you can bid only for those that fit (check whether the specifications limit how many one company can win).
Lots
- 1. Plataforma digital · 119.397,90 € excl. VAT
- 2. Señalización y equipamiento físico · 55.000,00 € excl. VAT
- 3. Contenidos turísticos y audiovisuales · 52.000,00 € excl. VAT
- 4. Consultoría estratégica, coordinación y creación de producto · 125.259,52 € excl. VAT
Award criteria
- Perfiles adicionales · 10,0 points · by formula
- Ampliación del plazo de garantía y soporte sobre 12 meses · 10,0 points · by formula
- Solución técnica propuesta · 16,0 points · value judgement
- Precio · 45,0 points · by formula
- Certificación ENS de categoría media o superior de la plataforma o solución base preexistente y de los sistemas de alojamiento · 5,0 points · by formula
- Metodología, planificación y transferencia · 14,0 points · value judgement
- Precio lote 2 · 55,0 points · by formula
- Reducción del plazo de fabricación, suministro e instalación (12 semanas) · 5,0 points · by formula
- Plan de instalación y coordinación · 12,0 points · value judgement
- Propuesta de diseño de la señalética · 18,0 points · value judgement
- Ampliación de la garantía de los equipos electrónicos sobre 24 meses · 10,0 points · by formula
- Metodología y plan de producción · 14,0 points · value judgement
- Puntos de interés adicionales sobre 50 · 10,0 points · by formula
- Vídeos 360º en ruta adicionales sobre 2 · 5,0 points · by formula
- Imágenes 360º adicionales sobre 30 · 5,0 points · by formula
- Precio Lote 3 · 45,0 points · by formula
- Propuesta creativa y editorial · 16,0 points · value judgement
- Perfil adicional Lote 3 · 5,0 points · by formula
- Perfiles adicionales Lote 4 · 10,0 points · by formula
- Propuesta de producto turístico heráldico · 10,0 points · value judgement
- Modelo de coordinación del conjunto y de apoyo a la gestión · 10,0 points · value judgement
- Precio Lote 4 · 45,0 points · by formula
- Experiencia del director/a de proyecto en planes de sostenibilidad o planificación turística · 10,0 points · by formula
- Metodología de diagnóstico y modelo de mejora (Fases I y II) · 10,0 points · value judgement
- Talleres participativos adicionales sobre 3 · 5,0 points · by formula
Solvency required
- Relación de los principales servicios o, en el Lote 2, suministros, de igual o similar naturaleza que los del objeto del lote, realizados en los tres últimos años, con indicación de importe, fecha y destinatario público o privado. Importe anual acumulado en el año de mayor ejecución igual o superior
- Compromiso de adscripción a la ejecución del contrato del equipo de trabajo mínimo de cada lote establecido en el apartado 8 del PPT, con los requisitos de titulación y experiencia allí exigidos (artículo 76.2 LCSP), con carácter de obligación esencial. Se declara en el Anexo II (archivo número 1) y
- Volumen anual de negocios en el ámbito de actividades correspondiente al objeto del lote, referido al año de mayor volumen de los tres últimos ejercicios concluidos, por importe igual o superior al valor estimado del lote: Lote 1, 119.397,90 €; Lote 2, 55.000,00 €; Lote 3, 52.000,00 €; Lote 4, 125.2
- Seguro de indemnización por riesgos profesionales vigente hasta el fin del plazo de presentación de ofertas, por importe igual o superior al valor estimado del lote (o a la suma de los valores estimados si se licita a varios lotes), con compromiso de renovación durante toda la ejecución del contrato
- Cumplimiento con las obligaciones con la Seguridad Social
- Cumplimiento con las obligaciones tributarias
- No prohibición para contratar
- Capacidad de obrar
- Para las empresas extranjeras, declaración de sometimiento a la legislación española.
The notice only lists the means; the amounts are in the specifications.
Short of solvency? Look for a partner for a joint venture (UTE)
In a joint venture (UTE) the solvency of each company is added together. We show you who has won contracts of the same kind for the amount that is missing.
Ask the specifications
An AI assistant is answering you. Only from what the specifications say, citing document and page; each citation is checked. Your question is processed outside your device and we do not store it under your name. What governs is the specifications.
EjemploMade-up data so you can see the result. It doesn't belong to any company or person.
Administrative specifications (PCAP) Read
Saved: Administrative specifications (PCAP), 38 pages.
Once the specifications are read, the questions, the compliance matrix and the proposal work from their text.
Sign in with your email: we'll send you a link, no password
We only keep your email to give you access. Privacy
Prepare my bid
The steps, in the order you do them. You submit on the contracting body's platform, not here.
- Decide whether to bid Should I bid?
- Read what they ask for Ask the specifications · Compliance matrix
- Prepare the paperwork Fill in the annexes of the specifications
- Review your bid Review my bid
- Submit it Submit on each platform · Add the deadline to my calendar
How much winners bid below
En 13.819 contratos parecidos (servicios de programación de software y de consultoría), quien ganó bajó una mediana del 1,5 % (half of them between 0,0 % and 15,0 %). With three or more bids, 18,0 %. Only one bid was submitted in 63 % of them. Work out the abnormally low bid threshold.
Comparable awards
En 1741 contratos basados en acuerdos marco parecidos, el importe adjudicado sin IVA tiene una mediana de 68.238,72 € (la mitad, entre 10.900,00 € y 282.529,44 €).
- Servicio de asistencia técnica para el desarrollo, mantenimiento y soporte en el ámbito de portales de juego seguro y su accesibilidad · 370.722,40 € · Entelgy Consulting S.A · 2026-01-29
- Prórroga del contrato 1130/2024. Contratación de asistencia técnica para el mantenimiento de los portales web de la AECID · 322.452,48 € · TECNOLOGÍAS PLEXUS S.L. · 2026-04-17
- Prórroga del contrato A2991/2025. Servicio de asistencia técnica para el desarrollo, mantenimiento y soporte en el ámbito de portales de juego seguro y su acces · 370.722,40 € · Entelgy Consulting S.A · 2026-07-01
- X260045SSOEE, Asistencia técnica para la prestación de servicios de soporte para la gestión de aplicaciones informáticas en producción, SGSICS. · 436.608,00 € · Ute Global Rosetta, S.L.U. y Connectis ICT · 2026-08-20
- Migración y renovación de la arquitectura central de seguridad interna para el Ministerio para la Transición Ecológica y el Reto Demográfico · 373.355,76 € · NTT SPAIN INTELLIGENT TECHNOLOGIES AND SERVICES S.L. · 2026-04-27
Son contratos basados en acuerdos marco de la compra centralizada del Estado, con precios y empresas ya fijados por el acuerdo: sirven de referencia de precio, no son licitaciones abiertas. Se comparan por el CPV de esta licitación y por las palabras del título; el feed no trae CPV. La baja solo se calcula con los contratos que traen presupuesto. Origen de los datos: Dirección General de Racionalización y Centralización de la Contratación – Ministerio de Hacienda.
How many points your reduction scores
We read the price formula in the specifications and apply it to your reduction against the best of the others.
Documents and notices
What Ayuntamiento de Torrelaguna buys and who it awards to · More tenders in Madrid · More tenders: iT and IT consulting · More tenders: construction materials
Guarantees, payments, appeals and all the data in the notice
Guarantees
Final guarantee: 5 % of the price you bid, excluding VAT. If you bid the base budget, 17.582,87 €; with your reduction, less. It is provided by the bidder with the best offer, before the award.
How it is provided
- Bank guarantee from a bank, savings bank, credit cooperative, financial credit institution or mutual guarantee society: joint and several, waiving the benefit of discussion, payable on first demand and with no end date.
- Surety bond with an insurer authorised in that line.
- Cash or Public Debt securities, at the Caja General de Depósitos (state deposit office) or at the deposit office of the contracting region or local entity.
- Withholding from the price, only if the specifications provide for it.
The final guarantee, as a bank guarantee or surety bond, is deposited at the Caja General de Depósitos or the equivalent deposit office of the contracting administration; the provisional one, as a bank guarantee or surety bond, is handed to the contracting authority.
Check who is vouching for you
Before paying the fee, check that the entity is registered: Bank of Spain register of entities (banks and mutual guarantee societies) or register of insurers of the Directorate-General for Insurance (surety bonds).
Public Sector Contracts Act, articles 106 to 111 (BOE); General Regulation, articles 55 to 59 (BOE); Regulation of the Caja General de Depósitos, article 12 (BOE). Consulted on 7-11-2026. What the specifications of this tender say prevails.
How long it takes to pay
Torrelaguna Town Council paid its suppliers in 162,8 days on average (abril–junio de 2026). That is above the 30 days the law sets: expect to be paid later, and factor the late-payment interest into your bid.
Source of the data: Ministerio de Hacienda, average supplier payment period (RD 635/2014), consulted on 19-11-2026. When you have to be paid and what to do if you are not.
Won it? Find subcontractors
If you win, part of the work can be subcontracted: local companies with similar work and, if the specifications reserve the contract, special employment centres and integration companies. See subcontractors
Minimum staff cost under the collective agreement
In services, staff cost sets the minimum price you can bid. Choose the collective agreement, enter its pay scale and check whether your bid covers it (art. 149.4 LCSP). Work out the staff cost
Your deadlines in working days
Counted using the calendar of the authority's seat: Torrelaguna (Comunidad de Madrid) (Law 39/2015, art. 30).
- Recurrir el anuncio o los pliegos
- Notice published on 13/11/2026: 15 working days from the day after Friday 13 November 2026. Expires on Friday 4 December 2026.
Si recurres los pliegos, hazlo antes de presentar tu oferta (art. 50.1.b).
There is no public holiday within the period: only Saturdays and Sundays are skipped. - If they ask you for the documents (art. 150.2)
- If the request reaches you today, 25/11/2026: 10 working days from the day after Wednesday 25 November 2026. Expires on Friday 11 December 2026.
If the act was published the same day on the contracting authority's profile, the deadline counts from the sending of the notification, not from when you open it (LCSP, Additional Provision 15): always use the earliest date.
Skipped, besides weekends:
- 07/12/2026 · Lunes siguiente a Día de la Constitución Española regional holiday, Comunidad de Madrid
- 08/12/2026 · Immaculate Conception national holiday
Excluding Saturdays, Sundays and national public holidays. Public holidays of Comunidad de Madrid are also deducted. The source has no local holidays for Torrelaguna for 2026: if the town council has any within the period, the period is extended by one day for each. Any day that the Administration's calendar of non-working days adds (art. 30.6 and 30.7 of Law 39/2015) also extends the period.
Datos de festivos.io — CC BY 4.0 — https://festivos.io. Códigos postales: GeoNames — CC BY 4.0 — https://www.geonames.org.Count another deadline with your calendar (API: since, dias, cp_organo, cp_interesado).
If you are excluded or disagree
If something in the notice or the specifications prevents you from bidding, or if the committee leaves out your bid, you can go for free before a specialised tribunal: the special appeal on procurement, which is voluntary (art. 44.7).
- What you can appeal
- The tender notice, the specifications and the contract documents.
- Procedural acts that decide on the award, prevent continuing or leave a party defenceless; in any case, the admission or rejection of candidates and bidders and the admission or exclusion of bids, including those excluded as abnormally low (art. 149).
- The award decision.
- Certain contract modifications (arts. 204 and 205), assignments to in-house bodies and concession buy-backs.
- Before which tribunal
- Tribunal Administrativo de Contratación Pública de la Comunidad de Madrid (TACP). For local entities the rule of their region applies (art. 46.4): the notice of the act tells you which tribunal covers your town council or provincial council. Source: LCSP, art. 46: órgano competente en las comunidades autónomas y entidades locales (consolidated text, accessed on 7 November 2026).
- Deadline
- 15 working days (art. 50.1). They are counted from the day after: the publication of the notice, for the notice and for the specifications (if the notice says how to access them); the day you learned of the act, for procedural acts such as an exclusion; the notification of the award. If you want to appeal the specifications, do so before submitting your bid (art. 50.1.b). The period keeps running while you ask to see the file (art. 52.2). Appealing the award suspends the procedure (art. 53). The appeal can be filed at the contracting authority's registry or at the tribunal's (art. 51.3).Source: LCSP, art. 50: iniciación del procedimiento y plazo (consolidated text, accessed on 7 November 2026).
- Applicable case law
- What is appealed and how long it takes. In 2025 the TACRC received 2.226 appeals (in 2024, 1.824). The award was appealed in 43,58 % of cases, the specifications in 25,18 % and the exclusion in 19,99 %. 15,85 % of appeals were upheld in full and 6,59 % in part; 46,95 % were dismissed and 30,64 % ended without a ruling on the merits. The average time to decide was 55 calendar days (in 2024, 46), counted from when the Tribunal has the file. Source: Memoria 2025 del Tribunal Administrativo Central de Recursos Contractuales (financial year 2025, pp. 14 and 17).
- OIReScon. The 2025 annual supervision report asks for attention to exclusions for bids deemed abnormal and to formal grounds for exclusion. Source: Informe anual de supervisión 2025 de la OIReScon: conclusiones y recomendaciones (approved on 22 December 2025). Source: Buscador de informes consultivos (OIReScon) (accessed on 7 November 2026).
- Junta Consultiva de Contratación Pública del Estado. Before leaving you out for a defect in the documents of the request (art. 150.2), they must give you a chance to correct it if it is not an absolute breach and the requirement already existed when the deadline expired. Source: Junta Consultiva de Contratación Pública del Estado, expediente 6/2021 (art. 150.2 LCSP) (file 6/2021). Source: Informes de la Junta Consultiva de Contratación Pública del Estado (accessed on 7 November 2026).
- Rulings and judgments. Search the TACRC decisions, case law on the CENDOJ. Where to look for those of your region's tribunal.
Everything about the special appeal · Review your bid before submitting it · Answer a formal request
| Contracting authority | Junta de Gobierno Local del Ayuntamiento de Torrelaguna |
|---|---|
| Case reference | 2320/2026 |
| Type of contract | Services |
| Procedure | Open |
| Régimen | Ley de Contratos del Sector Público; Regulación armonizada |
| Base budget excluding VAT | 351.657,42 € |
| Base budget including VAT | 425.505,48 € |
| Estimated value | 351.657,42 € |
| Place of performance | Madrid |
| CPV | 72262000 · Servicios de desarrollo de software; 44423400 · Señales y artículos conexos; 51000000 · Servicios de instalación (excepto software); 30231320 · Monitores de pantalla táctil; 79530000 · Servicios de traducción; 92111000 · Servicios de producción de películas de cine y vídeo |
| End of the submission period | 17/12/2026 at 23:59 (22 days left) |
| Status | Open for bids |
| Final guarantee | 5,0 % |
Régimen de esta licitación
- Ley de Contratos del Sector Público Ley 9/2017, de Contratos del Sector Público (LCSP)
Contrato regido por la Ley 9/2017. - Regulación armonizada Art. 19 de la Ley 9/2017
Supera el umbral europeo: el anuncio también sale en el Diario Oficial de la UE, y el DEUC y los plazos mínimos son los de la UE.
Origen de los datos: Ministerio de Hacienda (Plataforma de Contratación del Sector Público). Actualizado el 13/11/2026 a las 10:49. No somos una plataforma de contratación: la oferta se presenta en la del órgano.