Ejecución de las obras de la Memoria descriptiva valorada de las actuaciones de mejora en el tanque de tormentas y la arqueta de reunión de vertidos del Sistema de Saneamiento de Quintanar de la Orden (Toledo), cofinanciado por el Fondo Europeo de Desarrollo Regional FEDER 2021- 2027.
Obras de alcantarillado · Works contract · Madrid · Lasts 7 months
Should I bid?
To bid you need…
- Submit your bid on the contracting body's platform before 04/12/2026.
- Prove the solvency the notice asks for (further down, under “What they ask for”).
- A technical proposal: the value judgement is 45 % of the points.
What an experienced bidder checks before preparing a bid, with the data behind each point. The decision is yours.
- 10 days left.
- 55 % of the points are decided by figures; 45 %, by the technical proposal.
- In 68 contracts of this body in the same sector, usually 12,5 bids are submitted and the winner lowers the price by 11,1 % when there are three bids or more.
- If you win, you have 10 working days to hand in the documents that prove what you declared (art. 150.2 LCSP) and to lodge a performance guarantee of 5 % (up to 4.804 €).
Award criteria
- Criterio cuantificable mediante la mera aplicación de fórmulas · 45,0 points · by formula
- Compromiso del licitador · 10,0 points · by formula
- Criterios técnicos cuya valoración dependa de un juicio de valor · 45,0 points · value judgement
Solvency required
- Deberá indicar el personal técnico o de las unidades técnicas, integradas o no en la empresa, participantes en el contrato, especialmente aquellos encargados del control de calidad, a cuyos efectos deberá acreditarse disponer de, al menos, una persona que se encargue del control de calidad y que cue
- Describirá las medidas empleadas por el empresario para garantizar la calidad, siendo al menos necesaria la instauración interna de un procedimiento de control de calidad, que como mínimo deberá tener el alcance y los requisitos exigidos por la norma UNE/EN/ISO 9001
- deberá indicar de las medidas de gestión medioambiental que el empresario aplicará al ejecutar el contrato, a cuyos efectos deberá exponer las medidas que adoptará para eliminar o reducir los impactos producidos por la actividad objeto del contrato, que al menos deberán tener el alcance, y los requi
- Delegado del contratista: deberá ser un Titulado universitario. Director de ejecución de las obras (Jefe de Obra): deberá ser un deberá ser un técnico titulado competente titulado universitario con experiencia en los últimos cinco (5) años en trabajos similares
- Acreditar la ejecución en los últimos cinco (5) años de, como mínimo, una (1) obra eléctrica de media tensión cuyo importe sea igual o superior al 70% del valor estimado del contrato (67.258,24 €), I.V.A. excluido.
- Volumen anual de negocios (identificado como el importe neto de la cifra de negocios que figura en su Cuenta de Pérdidas y Ganancias) referido al año de mayor volumen de negocio de los tres últimos concluidos es, como mínimo, una vez y media el valor estimado del contrato, esto es 144.124,80 €, I.V.
- Cumplimiento con las obligaciones con la Seguridad Social
- No prohibición para contratar
- Capacidad de obrar
- No estar incurso en incompatibilidades
- Cumplimiento con las obligaciones tributarias
The notice only lists the means; the amounts are in the specifications.
Short of solvency? Look for a partner for a joint venture (UTE)
In a joint venture (UTE) the solvency of each company is added together. We show you who has won contracts of the same kind for the amount that is missing.
Ask the specifications
An AI assistant is answering you. Only from what the specifications say, citing document and page; each citation is checked. Your question is processed outside your device and we do not store it under your name. What governs is the specifications.
EjemploMade-up data so you can see the result. It doesn't belong to any company or person.
Administrative specifications (PCAP) Read
Saved: Administrative specifications (PCAP), 38 pages.
Once the specifications are read, the questions, the compliance matrix and the proposal work from their text.
Sign in with your email: we'll send you a link, no password
We only keep your email to give you access. Privacy
Prepare my bid
The steps, in the order you do them. You submit on the contracting body's platform, not here.
- Decide whether to bid Should I bid?
- Read what they ask for Ask the specifications · Compliance matrix
- Prepare the paperwork Fill in the annexes of the specifications
- Write the technical proposal Guided technical proposal · Simulated evaluator
- Review your bid Review my bid
- Submit it Submit on each platform · Add the deadline to my calendar
How much winners bid below
En 68 contratos de este órgano en el mismo sector (obras), quien ganó bajó una mediana del 10,5 % (half of them between 6,8 % and 16,9 %). With three or more bids, 11,1 %. Only one bid was submitted in 10 % of them. Work out the abnormally low bid threshold.
How many points your reduction scores
We read the price formula in the specifications and apply it to your reduction against the best of the others.
Documents and notices
What Sociedad Mercantil Estatal Aguas de las Cuencas de España, S.A. (ACUAES) buys and who it awards to · More tenders in Madrid · More tenders: works
Guarantees, payments, appeals and all the data in the notice
Guarantees
Final guarantee: 5 % of the price you bid, excluding VAT. If you bid the base budget, 4.804,16 €; with your reduction, less. It is provided by the bidder with the best offer, before the award.
How it is provided
- Bank guarantee from a bank, savings bank, credit cooperative, financial credit institution or mutual guarantee society: joint and several, waiving the benefit of discussion, payable on first demand and with no end date.
- Surety bond with an insurer authorised in that line.
- Cash or Public Debt securities, at the Caja General de Depósitos (state deposit office) or at the deposit office of the contracting region or local entity.
- Withholding from the price, only if the specifications provide for it.
The final guarantee, as a bank guarantee or surety bond, is deposited at the Caja General de Depósitos or the equivalent deposit office of the contracting administration; the provisional one, as a bank guarantee or surety bond, is handed to the contracting authority.
Check who is vouching for you
Before paying the fee, check that the entity is registered: Bank of Spain register of entities (banks and mutual guarantee societies) or register of insurers of the Directorate-General for Insurance (surety bonds).
Public Sector Contracts Act, articles 106 to 111 (BOE); General Regulation, articles 55 to 59 (BOE); Regulation of the Caja General de Depósitos, article 12 (BOE). Consulted on 7-11-2026. What the specifications of this tender say prevails.
Won it? Find subcontractors
If you win, part of the work can be subcontracted: local companies with similar work and, if the specifications reserve the contract, special employment centres and integration companies. See subcontractors
Your deadlines in working days
Counted using the calendar of the authority's seat: Madrid (Comunidad de Madrid) (Law 39/2015, art. 30).
- If they ask you for the documents (art. 150.2)
- If the request reaches you today, 24/11/2026: 10 working days from the day after Tuesday 24 November 2026. Expires on Thursday 10 December 2026.
If the act was published the same day on the contracting authority's profile, the deadline counts from the sending of the notification, not from when you open it (LCSP, Additional Provision 15): always use the earliest date.
Skipped, besides weekends:
- 07/12/2026 · Lunes siguiente a Día de la Constitución Española regional holiday, Comunidad de Madrid
- 08/12/2026 · Immaculate Conception national holiday
Excluding Saturdays, Sundays and national public holidays. Public holidays of Comunidad de Madrid are also deducted. Local holidays of Madrid are deducted. Any day that the Administration's calendar of non-working days adds (art. 30.6 and 30.7 of Law 39/2015) also extends the period.
Datos de festivos.io — CC BY 4.0 — https://festivos.io. Códigos postales: GeoNames — CC BY 4.0 — https://www.geonames.org.Count another deadline with your calendar (API: since, dias, cp_organo, cp_interesado).
If you are excluded or disagree
This contract is below 3.000.000 € of estimated value: it is not subject to the special appeal. Its acts are appealed under Law 39/2015 and Law 29/1998 on the contentious-administrative jurisdiction (art. 44.6). Before submitting, review your bid so that there is nothing to appeal. Source: LCSP, art. 44: recurso especial en materia de contratación, actos recurribles (consolidated text, accessed on 7 November 2026).
| Contracting authority | Consejo de Administración de Sociedad Mercantil Estatal Aguas de las Cuencas de España, S.A. (ACUAES) |
|---|---|
| Case reference | ACE/423.01/26/OBRA/02 |
| Type of contract | Works |
| Procedure | Open |
| Régimen | Ley de Contratos del Sector Público |
| Base budget excluding VAT | 96.083,20 € |
| Base budget including VAT | 116.260,67 € |
| Estimated value | 96.083,20 € |
| Place of performance | Madrid |
| CPV | 45232400 · Obras de alcantarillado |
| End of the submission period | 04/12/2026 at 13:00 (10 days left) |
| Status | Open for bids |
| Final guarantee | 5,0 % |
Régimen de esta licitación
- Ley de Contratos del Sector Público Ley 9/2017, de Contratos del Sector Público (LCSP)
Contrato regido por la Ley 9/2017. - Fondos de la UE Código de financiación EU
La financiación europea trae obligaciones de información y de publicidad: el pliego las detalla. - Fondo Europeo de Desarrollo Regional (FEDER) Código de financiación FEDER
La financiación europea trae obligaciones de información y de publicidad: el pliego las detalla.
Origen de los datos: Ministerio de Hacienda (Plataforma de Contratación del Sector Público). Actualizado el 03/11/2026 a las 08:38. No somos una plataforma de contratación: la oferta se presenta en la del órgano.