Dotar de iluminación eficiente a un tramo de la carretera PO-226 y a la Senda de Alberguería, en el concello de Moraña, mejorando las condiciones de seguridad viaria y peatonal, así como la calidad del servicio de alumbrado público en la zona de actuación.

Instalación de equipo de alumbrado para carreteras · Works contract · Pontevedra · Lasts 2 months

Submission deadlineClosed23/11/2026 at 15:00
Base budget excluding VAT59.000,27 €
Contracting authorityAlcaldia del Ayuntamiento de MorañaProcedure: Simplified open
Specifications Administrative clauses specification · Technical specifications (they open on the Platform, in a new tab)

The submission deadline has already closed. If you follow it, we email you when a new document comes out, or it is cancelled or awarded.

When it ends, it may be tendered again: we email you when another one from the same body and of the same kind of work comes out.

Award criteria

Solvency required

The notice only lists the means; the amounts are in the specifications.

Ask the specifications

An AI assistant is answering you. Only from what the specifications say, citing document and page; each citation is checked. Your question is processed outside your device and we do not store it under your name. What governs is the specifications.

How much winners bid below

En 10.295 contratos parecidos (trabajos de instalación en edificios), quien ganó bajó una mediana del 15,0 % (half of them between 5,2 % and 25,4 %). With three or more bids, 20,3 %. Only one bid was submitted in 19 % of them. Work out the abnormally low bid threshold.

How many points your reduction scores

We read the price formula in the specifications and apply it to your reduction against the best of the others.

Documents and notices

What Ayuntamiento de Moraña buys and who it awards to · More tenders in Pontevedra · More tenders: works

Guarantees, payments, appeals and all the data in the notice

How long it takes to pay

Moraña Town Council paid its suppliers in 12,5 days on average (abril–junio de 2026). Within the 30 days the law sets.

Source of the data: Ministerio de Hacienda, average supplier payment period (RD 635/2014), consulted on 19-11-2026. When you have to be paid and what to do if you are not.

Won it? Find subcontractors

If you win, part of the work can be subcontracted: local companies with similar work and, if the specifications reserve the contract, special employment centres and integration companies. See subcontractors

Your deadlines in working days

Counted using the calendar of the authority's seat: Moraña (Galicia) (Law 39/2015, art. 30).

If they ask you for the documents (art. 150.2)
If the request reaches you today, 23/11/2026: 7 working days from the day after Monday 23 November 2026. Expires on Wednesday 2 December 2026.

If the act was published the same day on the contracting authority's profile, the deadline counts from the sending of the notification, not from when you open it (LCSP, Additional Provision 15): always use the earliest date.

There is no public holiday within the period: only Saturdays and Sundays are skipped.

Excluding Saturdays, Sundays and national public holidays. Public holidays of Galicia are also deducted. Local holidays of Moraña are deducted. Any day that the Administration's calendar of non-working days adds (art. 30.6 and 30.7 of Law 39/2015) also extends the period.

Datos de festivos.io — CC BY 4.0 — https://festivos.io. Códigos postales: GeoNames — CC BY 4.0 — https://www.geonames.org.

Count another deadline with your calendar (API: since, dias, cp_organo, cp_interesado).

If you are excluded or disagree

This contract is below 3.000.000 € of estimated value: it is not subject to the special appeal. Its acts are appealed under Law 39/2015 and Law 29/1998 on the contentious-administrative jurisdiction (art. 44.6). Before submitting, review your bid so that there is nothing to appeal. Source: LCSP, art. 44: recurso especial en materia de contratación, actos recurribles (consolidated text, accessed on 7 November 2026).

Contracting authorityAlcaldia del Ayuntamiento de Moraña
Case reference1021/2026
Type of contractWorks
ProcedureSimplified open
RégimenLey de Contratos del Sector Público
Base budget excluding VAT59.000,27 €
Base budget including VAT71.390,33 €
Estimated value59.000,27 €
Place of performancePontevedra
CPV45316110 · Instalación de equipo de alumbrado para carreteras; 45316000 · Trabajos de instalación de sistemas de alumbrado y señalización; 45316100 · Instalación de equipo de alumbrado exterior
End of the submission period23/11/2026 at 15:00 (period closed)
StatusDeadline closed; award pending
Final guarantee5,0 %

Régimen de esta licitación