Skip to content
AIM PAPYRSign inMenu
Tenders · Granada

Contrato de obras para la ejecución material de aquellas actuaciones que deban ser realizadas en régimen de ejecución subsidiaria o actuación urgente por el Ayuntamiento de Granada

Trabajos de construcción · Works contract · Granada · Lasts 60 months

Submission deadlineClosed23/11/2026 at 17:30
Base budget excluding VAT1.430.056,88 €estimated value 4.290.170,64 €
Contracting authorityJunta de Gobierno del Ayuntamiento de GranadaProcedure: Open
Specifications Administrative clauses specification · Technical specifications (they open on the Platform, in a new tab)

The submission deadline has already closed. If you follow it, we email you when a new document comes out, or it is cancelled or awarded.

When it ends, it may be tendered again: we email you when another one from the same body and of the same kind of work comes out.

Award criteria

Solvency required

The notice only lists the means; the amounts are in the specifications.

Ask the specifications

An AI assistant is answering you. Only from what the specifications say, citing document and page; each citation is checked. Your question is processed outside your device and we do not store it under your name. What governs is the specifications.

How much winners bid below

En 62 contratos de este órgano en el mismo sector (obras), quien ganó bajó una mediana del 8,2 % (half of them between 1,0 % and 13,0 %). With three or more bids, 12,3 %. Only one bid was submitted in 35 % of them. Work out the abnormally low bid threshold.

How many points your reduction scores

We read the price formula in the specifications and apply it to your reduction against the best of the others.

Published by the authority

Documents and notices

What Ayuntamiento de Granada buys and who it awards to · More tenders in Granada · More tenders: works

Guarantees, payments, appeals and all the data in the notice

How long it takes to pay

Granada Town Council paid its suppliers in 19,5 days on average (abril–junio de 2026). Within the 30 days the law sets.

Source of the data: Ministerio de Hacienda, average supplier payment period (RD 635/2014), consulted on 19-11-2026. When you have to be paid and what to do if you are not.

Won it? Find subcontractors

If you win, part of the work can be subcontracted: local companies with similar work and, if the specifications reserve the contract, special employment centres and integration companies. See subcontractors

Your deadlines in working days

Counted using the calendar of the authority's seat: Andalucía (Law 39/2015, art. 30).

If they ask you for the documents (art. 150.2)
If the request reaches you today, 23/11/2026: 10 working days from the day after Monday 23 November 2026. Expires on Wednesday 9 December 2026.

If the act was published the same day on the contracting authority's profile, the deadline counts from the sending of the notification, not from when you open it (LCSP, Additional Provision 15): always use the earliest date.

Skipped, besides weekends:

  • 07/12/2026 · Lunes siguiente a Día de la Constitución Española regional holiday, Andalucía
  • 08/12/2026 · Immaculate Conception national holiday

Excluding Saturdays, Sundays and national public holidays. Public holidays of Andalucía are also deducted. To deduct local holidays too, enter the postcode of the authority's seat; meanwhile, each local holiday that falls within the period extends it by one day. Any day that the Administration's calendar of non-working days adds (art. 30.6 and 30.7 of Law 39/2015) also extends the period.

Count another deadline with your calendar (API: since, dias, cp_organo, cp_interesado).

If you are excluded or disagree

If something in the notice or the specifications prevents you from bidding, or if the committee leaves out your bid, you can go for free before a specialised tribunal: the special appeal on procurement, which is voluntary (art. 44.7).

What you can appeal
  • The tender notice, the specifications and the contract documents.
  • Procedural acts that decide on the award, prevent continuing or leave a party defenceless; in any case, the admission or rejection of candidates and bidders and the admission or exclusion of bids, including those excluded as abnormally low (art. 149).
  • The award decision.
  • Certain contract modifications (arts. 204 and 205), assignments to in-house bodies and concession buy-backs.
Source: LCSP, art. 44: recurso especial en materia de contratación, actos recurribles (consolidated text, accessed on 7 November 2026).
Before which tribunal
Tribunal Administrativo de Recursos Contractuales de la Junta de Andalucía (TARCJA). For local entities the rule of their region applies (art. 46.4): the notice of the act tells you which tribunal covers your town council or provincial council. Source: LCSP, art. 46: órgano competente en las comunidades autónomas y entidades locales (consolidated text, accessed on 7 November 2026).
Deadline
15 working days (art. 50.1). They are counted from the day after: the publication of the notice, for the notice and for the specifications (if the notice says how to access them); the day you learned of the act, for procedural acts such as an exclusion; the notification of the award. If you want to appeal the specifications, do so before submitting your bid (art. 50.1.b). The period keeps running while you ask to see the file (art. 52.2). Appealing the award suspends the procedure (art. 53). The appeal can be filed at the contracting authority's registry or at the tribunal's (art. 51.3).Source: LCSP, art. 50: iniciación del procedimiento y plazo (consolidated text, accessed on 7 November 2026).
Applicable case law

Everything about the special appeal · Review your bid before submitting it · Answer a formal request

Contracting authorityJunta de Gobierno del Ayuntamiento de Granada
Case referenceOBR-2026000117
Type of contractWorks
ProcedureOpen
RégimenLey de Contratos del Sector Público
Base budget excluding VAT1.430.056,88 €
Base budget including VAT1.730.368,82 €
Estimated value4.290.170,64 €
Place of performanceGranada
CPV45000000 · Trabajos de construcción; 45111100 · Trabajos de demolición; 45262100 · Trabajos de andamiaje
End of the submission period23/11/2026 at 17:30 (period closed)
StatusDeadline closed; award pending
Final guarantee5,0 %

Régimen de esta licitación

Origen de los datos: Ministerio de Hacienda (Plataforma de Contratación del Sector Público). Actualizado el 29/10/2026 a las 08:46. No somos una plataforma de contratación: la oferta se presenta en la del órgano.