Mantenimiento de la infraestructura de telecomunicaciones y los sistemas de seguridad y explotación de la Autoridad Portuaria de la Bahía de Algeciras
Servicios de mantenimiento de infraestructura de telecomunicaciones · Services contract · Cádiz · Lasts 24 months
Should I bid?
To bid you need…
- Submit your bid on the contracting body's platform before 24/11/2026.
- Prove the solvency the notice asks for (further down, under “What they ask for”).
- The ESPD (your statement that you meet the requirements): the contracting body publishes its own and you can prepare it here.
- A technical proposal: the value judgement is 50 % of the points.
What an experienced bidder checks before preparing a bid, with the data behind each point. The decision is yours.
- 5 days left.
- The technical proposal decides: 50 % of the points are a value judgement; the price, 40 out of 100.
- In 21 contracts of this body in the same sector, usually 2 bids are submitted and the winner lowers the price by 20,4 % when there are three bids or more.
- In favour: In 48 % of them there was only one bid: competition is usually low.
- If you win, you have 10 working days to hand in the documents that prove what you declared (art. 150.2 LCSP) and to lodge a performance guarantee of 5 % (up to 113.000 €).
Award criteria
- Criterios cualitativos valorables mediante juicio de valor (CC1) · 50,0 points · value judgement
- Criterios cualitativos valorables mediante mediante formulas (CC2) · 10,0 points · by formula
- Oferta económica (CE) · 40,0 points · by formula
Solvency required
- B.1.2 Una relación de los principales servicios efectuados, en los tres últimos años, de igual o similar naturaleza que los que constituyen el objeto del contrato, cuyo importe anual acumulado en el año de mayor ejecución sea igual o superior al 70 por ciento de la anualidad media del contrato. El
- B.4.- Control sobre la capacidad técnica del empresario y, si fuera necesario, sobre los medios de estudio e investigación con que cuenta, así como sobre las medidas empleadas para controlar la calidad. B.4.1 El licitador deberá disponer de un Sistema de Gestión certificado, de acuerdo con las Norm
- B.6 Indicación de las medidas de gestión medioambiental que el empresario podrá aplicar al ejecutar el contrato. 6.1. Se exige que el empresario posea certificados expedidos por los organismos, públicos y privados, nacionales o internacionales, que acrediten el cumplimiento de las siguientes norma
- A.1.3 Volumen anual de negocios del licitador o candidato, que referido al año de mayor volumen de negocio de los tres últimos concluidos deberá ser al menos una vez y media el valor estimado del contrato cuando su duración no sea superior a un año, y al menos una vez y media el valor anual medio de
- Cumplimiento con las obligaciones tributarias
- No prohibición para contratar
- Cumplimiento con las obligaciones con la Seguridad Social
- Capacidad de obrar
The notice only lists the means; the amounts are in the specifications.
Short of solvency? Look for a partner for a joint venture (UTE)
In a joint venture (UTE) the solvency of each company is added together. We show you who has won contracts of the same kind for the amount that is missing.
Ask the specifications
An AI assistant is answering you. Only from what the specifications say, citing document and page; each citation is checked. Your question is processed outside your device and we do not store it under your name. What governs is the specifications.
EjemploMade-up data so you can see the result. It doesn't belong to any company or person.
Administrative specifications (PCAP) Read
Saved: Administrative specifications (PCAP), 38 pages.
Once the specifications are read, the questions, the compliance matrix and the proposal work from their text.
Sign in with your email: we'll send you a link, no password
We only keep your email to give you access. Privacy
Prepare my bid
The steps, in the order you do them. You submit on the contracting body's platform, not here.
- Decide whether to bid Should I bid?
- Read what they ask for Ask the specifications · Compliance matrix
- Prepare the paperwork Fill in the ESPD · Fill in the annexes of the specifications
- Write the technical proposal Guided technical proposal · Simulated evaluator
- Review your bid Review my bid
- Submit it Submit on each platform · Add the deadline to my calendar
How much winners bid below
En 21 contratos de este órgano en el mismo sector (reparación y mantenimiento), quien ganó bajó una mediana del 9,0 % (half of them between 1,4 % and 20,4 %). With three or more bids, 20,4 %. Only one bid was submitted in 48 % of them. Work out the abnormally low bid threshold.
How many points your reduction scores
We read the price formula in the specifications and apply it to your reduction against the best of the others.
Published by the authority
Documents and notices
What Autoridad Portuaria de la Bahía de Algeciras buys and who it awards to · More tenders in Cádiz · More tenders: repair and maintenance
Guarantees, payments, appeals and all the data in the notice
Guarantees
Final guarantee: 5 % of the price you bid, excluding VAT. If you bid the base budget, 113.000,00 €; with your reduction, less. It is provided by the bidder with the best offer, before the award.
How it is provided
- Bank guarantee from a bank, savings bank, credit cooperative, financial credit institution or mutual guarantee society: joint and several, waiving the benefit of discussion, payable on first demand and with no end date.
- Surety bond with an insurer authorised in that line.
- Cash or Public Debt securities, at the Caja General de Depósitos (state deposit office) or at the deposit office of the contracting region or local entity.
- Withholding from the price, only if the specifications provide for it.
The final guarantee, as a bank guarantee or surety bond, is deposited at the Caja General de Depósitos or the equivalent deposit office of the contracting administration; the provisional one, as a bank guarantee or surety bond, is handed to the contracting authority.
Check who is vouching for you
Before paying the fee, check that the entity is registered: Bank of Spain register of entities (banks and mutual guarantee societies) or register of insurers of the Directorate-General for Insurance (surety bonds).
Public Sector Contracts Act, articles 106 to 111 (BOE); General Regulation, articles 55 to 59 (BOE); Regulation of the Caja General de Depósitos, article 12 (BOE). Consulted on 7-11-2026. What the specifications of this tender say prevails.
Won it? Find subcontractors
If you win, part of the work can be subcontracted: local companies with similar work and, if the specifications reserve the contract, special employment centres and integration companies. See subcontractors
Minimum staff cost under the collective agreement
In services, staff cost sets the minimum price you can bid. Choose the collective agreement, enter its pay scale and check whether your bid covers it (art. 149.4 LCSP). Work out the staff cost
Your deadlines in working days
Counted using the calendar of the authority's seat: Algeciras (Andalucía) (Law 39/2015, art. 30).
- If they ask you for the documents (art. 150.2)
- If the request reaches you today, 19/11/2026: 10 working days from the day after Thursday 19 November 2026. Expires on Thursday 3 December 2026. There is no public holiday within the period: only Saturdays and Sundays are skipped.
Excluding Saturdays, Sundays and national public holidays. Public holidays of Andalucía are also deducted. Local holidays of Algeciras are deducted. Any day that the Administration's calendar of non-working days adds (art. 30.6 and 30.7 of Law 39/2015) also extends the period.
Datos de festivos.io — CC BY 4.0 — https://festivos.io. Códigos postales: GeoNames — CC BY 4.0 — https://www.geonames.org.Count another deadline with your calendar (API: since, dias, cp_organo, cp_interesado).
If you are excluded or disagree
If something in the notice or the specifications prevents you from bidding, or if the committee leaves out your bid, you can go for free before a specialised tribunal: the special appeal on procurement, which is voluntary (art. 44.7).
- What you can appeal
- The tender notice, the specifications and the contract documents.
- Procedural acts that decide on the award, prevent continuing or leave a party defenceless; in any case, the admission or rejection of candidates and bidders and the admission or exclusion of bids, including those excluded as abnormally low (art. 149).
- The award decision.
- Certain contract modifications (arts. 204 and 205), assignments to in-house bodies and concession buy-backs.
- Before which tribunal
- Tribunal Administrativo Central de Recursos Contractuales (TACRC). Source: LCSP, art. 45: órgano competente en la Administración General del Estado (consolidated text, accessed on 7 November 2026).
- Deadline
- 15 working days (art. 50.1). They are counted from the day after: the publication of the notice, for the notice and for the specifications (if the notice says how to access them); the day you learned of the act, for procedural acts such as an exclusion; the notification of the award. If you want to appeal the specifications, do so before submitting your bid (art. 50.1.b). The period keeps running while you ask to see the file (art. 52.2). Appealing the award suspends the procedure (art. 53). The appeal can be filed at the contracting authority's registry or at the tribunal's (art. 51.3).Source: LCSP, art. 50: iniciación del procedimiento y plazo (consolidated text, accessed on 7 November 2026).
- Applicable case law
- What is appealed and how long it takes. In 2025 the TACRC received 2.226 appeals (in 2024, 1.824). The award was appealed in 43,58 % of cases, the specifications in 25,18 % and the exclusion in 19,99 %. 15,85 % of appeals were upheld in full and 6,59 % in part; 46,95 % were dismissed and 30,64 % ended without a ruling on the merits. The average time to decide was 55 calendar days (in 2024, 46), counted from when the Tribunal has the file. Source: Memoria 2025 del Tribunal Administrativo Central de Recursos Contractuales (financial year 2025, pp. 14 and 17).
- OIReScon. The 2025 annual supervision report asks for attention to exclusions for bids deemed abnormal and to formal grounds for exclusion. Source: Informe anual de supervisión 2025 de la OIReScon: conclusiones y recomendaciones (approved on 22 December 2025). Source: Buscador de informes consultivos (OIReScon) (accessed on 7 November 2026).
- Junta Consultiva de Contratación Pública del Estado. Before leaving you out for a defect in the documents of the request (art. 150.2), they must give you a chance to correct it if it is not an absolute breach and the requirement already existed when the deadline expired. Source: Junta Consultiva de Contratación Pública del Estado, expediente 6/2021 (art. 150.2 LCSP) (file 6/2021). Source: Informes de la Junta Consultiva de Contratación Pública del Estado (accessed on 7 November 2026).
- Rulings and judgments. Search the TACRC decisions, case law on the CENDOJ. Where to look for those of your region's tribunal.
Everything about the special appeal · Review your bid before submitting it
| Contracting authority | Presidencia de la Autoridad Portuaria de la Bahía de Algeciras |
|---|---|
| Case reference | 2026-078 |
| Type of contract | Services |
| Procedure | Open |
| Régimen | Sectores especiales: agua, energía, transportes y servicios postales |
| Base budget excluding VAT | 2.260.000,00 € |
| Base budget including VAT | 2.734.600,00 € |
| Estimated value | 5.892.000,00 € |
| Place of performance | Cádiz |
| CPV | 50332000 · Servicios de mantenimiento de infraestructura de telecomunicaciones; 50334400 · Servicios de mantenimiento de sistemas de comunicaciones; 50333000 · Servicios de mantenimiento de equipo de radiocomunicaciones; 50610000 · Servicios de reparación y mantenimiento de equipos de seguridad |
| End of the submission period | 24/11/2026 at 14:00 (5 days left) |
| Status | Open for bids |
| Final guarantee | 5,0 % |
Régimen de esta licitación
- Sectores especiales: agua, energía, transportes y servicios postales Real Decreto-ley 3/2020, Libro primero (transpone la Directiva 2014/25/UE)
La entidad contrata con las reglas de los sectores especiales, no con las de la Ley 9/2017: tiene su propio régimen de procedimientos y plazos. Lee el pliego o las normas de contratación de la entidad antes de preparar la oferta.
Origen de los datos: Ministerio de Hacienda (Plataforma de Contratación del Sector Público). Actualizado el 05/11/2026 a las 08:15. No somos una plataforma de contratación: la oferta se presenta en la del órgano.