Skip to content
AIM PAPYRSign inMenu
Tenders · España

Suministro y sustitución de enfriadoras en la LAV Madrid - Valladolid. Túnel de Guadarrama

Sistemas de detección de incendios · Supply contract · España · Lasts 6 months

Submission deadlineClosed23/11/2026 at 11:00
Base budget excluding VAT373.433,48 €
Contracting authorityADIF Alta Velocidad - PresidenciaProcedure: Open
Specifications Administrative clauses specification · Technical specifications (they open on the Platform, in a new tab)

The submission deadline has already closed. If you follow it, we email you when a new document comes out, or it is cancelled or awarded.

When it ends, it may be tendered again: we email you when another one from the same body and of the same kind of work comes out.

Award criteria

Solvency required

The notice only lists the means; the amounts are in the specifications.

Ask the specifications

An AI assistant is answering you. Only from what the specifications say, citing document and page; each citation is checked. Your question is processed outside your device and we do not store it under your name. What governs is the specifications.

How much winners bid below

En 18 contratos de este órgano en el mismo sector (material eléctrico e iluminación), quien ganó bajó una mediana del 17,6 % (half of them between 3,8 % and 28,3 %). With three or more bids, 26,9 %. Only one bid was submitted in 22 % of them. Work out the abnormally low bid threshold.

How many points your reduction scores

We read the price formula in the specifications and apply it to your reduction against the best of the others.

Published by the authority

Documents and notices

What ADIF Alta Velocidad - Presidencia buys and who it awards to · More tenders: electrical equipment and lighting

Guarantees, payments, appeals and all the data in the notice

Won it? Find subcontractors

If you win, part of the work can be subcontracted: local companies with similar work and, if the specifications reserve the contract, special employment centres and integration companies. See subcontractors

Your deadlines in working days

Counted using the calendar of the authority's seat: Madrid (Comunidad de Madrid) (Law 39/2015, art. 30).

If they ask you for the documents (art. 150.2)
If the request reaches you today, 23/11/2026: 10 working days from the day after Monday 23 November 2026. Expires on Wednesday 9 December 2026.

If the act was published the same day on the contracting authority's profile, the deadline counts from the sending of the notification, not from when you open it (LCSP, Additional Provision 15): always use the earliest date.

Skipped, besides weekends:

  • 07/12/2026 · Lunes siguiente a Día de la Constitución Española regional holiday, Comunidad de Madrid
  • 08/12/2026 · Immaculate Conception national holiday

Excluding Saturdays, Sundays and national public holidays. Public holidays of Comunidad de Madrid are also deducted. Local holidays of Madrid are deducted. Any day that the Administration's calendar of non-working days adds (art. 30.6 and 30.7 of Law 39/2015) also extends the period.

Datos de festivos.io — CC BY 4.0 — https://festivos.io. Códigos postales: GeoNames — CC BY 4.0 — https://www.geonames.org.

Count another deadline with your calendar (API: since, dias, cp_organo, cp_interesado).

If you are excluded or disagree

If something in the notice or the specifications prevents you from bidding, or if the committee leaves out your bid, you can go for free before a specialised tribunal: the special appeal on procurement, which is voluntary (art. 44.7).

What you can appeal
  • The tender notice, the specifications and the contract documents.
  • Procedural acts that decide on the award, prevent continuing or leave a party defenceless; in any case, the admission or rejection of candidates and bidders and the admission or exclusion of bids, including those excluded as abnormally low (art. 149).
  • The award decision.
  • Certain contract modifications (arts. 204 and 205), assignments to in-house bodies and concession buy-backs.
Source: LCSP, art. 44: recurso especial en materia de contratación, actos recurribles (consolidated text, accessed on 7 November 2026).
Before which tribunal
It depends on the administration the contracting authority belongs to: the TACRC if it is a State one (art. 45) and the region's tribunal if it is regional or local (art. 46). See the table of tribunals. Source: LCSP, art. 46: órgano competente en las comunidades autónomas y entidades locales (consolidated text, accessed on 7 November 2026).
Deadline
15 working days (art. 50.1). They are counted from the day after: the publication of the notice, for the notice and for the specifications (if the notice says how to access them); the day you learned of the act, for procedural acts such as an exclusion; the notification of the award. If you want to appeal the specifications, do so before submitting your bid (art. 50.1.b). The period keeps running while you ask to see the file (art. 52.2). Appealing the award suspends the procedure (art. 53). The appeal can be filed at the contracting authority's registry or at the tribunal's (art. 51.3).Source: LCSP, art. 50: iniciación del procedimiento y plazo (consolidated text, accessed on 7 November 2026).
Applicable case law

Everything about the special appeal · Review your bid before submitting it · Answer a formal request

Contracting authorityADIF Alta Velocidad - Presidencia
Case reference3.26/20810.0095
Type of contractSupplies
ProcedureOpen
RégimenLey de Contratos del Sector Público
Base budget excluding VAT373.433,48 €
Base budget including VAT451.854,51 €
Estimated value373.433,48 €
Place of performanceEspaña
CPV31625100 · Sistemas de detección de incendios
End of the submission period23/11/2026 at 11:00 (period closed)
StatusDeadline closed; award pending

Régimen de esta licitación

Origen de los datos: Ministerio de Hacienda (Plataforma de Contratación del Sector Público). Actualizado el 17/11/2026 a las 12:37. No somos una plataforma de contratación: la oferta se presenta en la del órgano.