SDA consultorías y asistencias técnicas complementarias a obras.
Servicios de arquitectura y servicios conexos · Services contract · Madrid · 9 lots
Second chance
Last time it was put out, it went unawarded (27/01/2025). Cuando hay tan poca competencia, una empresa más tiene muchas opciones.
The precedent, from the same authority and with a similar subject: Consultoría y Asistencias Técnicas complementarias a la ejecución de obras (file V-SD/2024/013676), budget at the time 450.000,00 € excluding VAT. More tenders like this.
Should I bid?
To bid you need…
- Submit your bid on the contracting body's platform before 04/02/2030.
- Prove the solvency the notice asks for (further down, under “What they ask for”).
- The ESPD (your statement that you meet the requirements): the contracting body publishes its own and you can prepare it here.
- A technical proposal: the value judgement is 100 % of the points.
What an experienced bidder checks before preparing a bid, with the data behind each point. The decision is yours.
- In favour: 1170 days left: there is time for the technical proposal.
- The technical proposal decides: 100 % of the points are a value judgement.
- In 43 contracts of this body in the same sector, usually 16 bids are submitted and the winner lowers the price by 20,2 % when there are three bids or more.
- If you win, you have 10 working days to hand in the documents that prove what you declared (art. 150.2 LCSP) and to lodge a performance guarantee of 5 % (up to 187.000 €).
- Subject to harmonised regulation: it is also published in the OJEU and a special appeal is possible.
- In favour: 9 lots: you can bid only for those that fit (check whether the specifications limit how many one company can win).
Lots
- 1. Redacción de proyectos y/o dirección de obras totales o parciales de arquitectura, ingeniería y urbanismo cuyo valor estimado del servicio será mayor de 15.000 € y menor de 150.000 € (IVA excluido) · 900.000,00 € excl. VAT
- 2. Redacción de proyectos y/o dirección de obras totales o parciales de arquitectura, ingeniería y urbanismo cuyo valor estimado del servicio será menor o igual a 15.000 € (IVA excluido) · 600.000,00 € excl. VAT
- 3. Asistencia técnica para coordinación de seguridad y salud en ejecución de obra · 240.000,00 € excl. VAT
- 4. Redacción de proyectos y/o dirección de obras totales o parciales de instalaciones en edificios y exteriores. · 600.000,00 € excl. VAT
- 5. Consultoría y desarrollo de cálculos relacionados con la seguridad de los edificios y cálculo estructural. · 100.000,00 € excl. VAT
- 6. Consultoría para temas relacionados con instalaciones, auditorías técnicas y eficiencia energética. · 300.000,00 € excl. VAT
- 7. Consultoría para inspecciones reglamentarias · 600.000,00 € excl. VAT
- 8. Consultoría especializada en arqueología y paleontología · 200.000,00 € excl. VAT
- 9. Consultoría para la elaboración e implantación de planes de autoprotección en edificios de la UCM · 200.000,00 € excl. VAT
Award criteria
- Criterios de Selección. Apartado 7 del PCAP. · 100,0 points · value judgement
Solvency required
- Capacidad de obrar
- No prohibición para contratar
Short of solvency? Look for a partner for a joint venture (UTE)
In a joint venture (UTE) the solvency of each company is added together. We show you who has won contracts of the same kind for the amount that is missing.
Prepare my bid
The steps, in the order you do them. You submit on the contracting body's platform, not here.
- Decide whether to bid Should I bid?
- Read what they ask for Compliance matrix
- Prepare the paperwork Fill in the ESPD
- Review your bid Review my bid
- Submit it Submit on each platform · Add the deadline to my calendar
How much winners bid below
En 43 contratos de este órgano en el mismo sector (arquitectura e ingeniería), quien ganó bajó una mediana del 19,1 % (half of them between 11,0 % and 27,0 %). With three or more bids, 20,2 %. Only one bid was submitted in 7 % of them. Work out the abnormally low bid threshold.
Published by the authority
- Acta del órgano de asistencia · ·
- Acta del órgano de asistencia · ·
- Acta del órgano de asistencia · ·
- Acta del órgano de asistencia · ·
- Acta del órgano de asistencia · ·
- Acta del órgano de asistencia · ·
- Acta del órgano de asistencia · ·
- Acta del órgano de asistencia · ·
- Acta del órgano de asistencia · ·
- Acta del órgano de asistencia · ·
- 260929 Informe tecnico solv tecn ARQ C 9 ·
- Resolución admitidos 1 establecimiento
- DEUC
- Res 2 Admisión 290526
- Resolucion admision 3 010726 signed.pdf
- 260910 Resolucion admision 4 290726
- 261111 RESOL ADMISION 6 15 octubre signed
Documents and notices
What Universidad Complutense de Madrid buys and who it awards to · More tenders in Madrid · More tenders: architecture and engineering
Guarantees, payments, appeals and all the data in the notice
Guarantees
Final guarantee: 5 % of the price you bid, excluding VAT (what the law sets; the specifications may exempt it). If you bid the base budget, 187.000,00 €; with your reduction, less. It is provided by the bidder with the best offer, before the award.
How it is provided
- Bank guarantee from a bank, savings bank, credit cooperative, financial credit institution or mutual guarantee society: joint and several, waiving the benefit of discussion, payable on first demand and with no end date.
- Surety bond with an insurer authorised in that line.
- Cash or Public Debt securities, at the Caja General de Depósitos (state deposit office) or at the deposit office of the contracting region or local entity.
- Withholding from the price, only if the specifications provide for it.
The final guarantee, as a bank guarantee or surety bond, is deposited at the Caja General de Depósitos or the equivalent deposit office of the contracting administration; the provisional one, as a bank guarantee or surety bond, is handed to the contracting authority.
Check who is vouching for you
Before paying the fee, check that the entity is registered: Bank of Spain register of entities (banks and mutual guarantee societies) or register of insurers of the Directorate-General for Insurance (surety bonds).
Public Sector Contracts Act, articles 106 to 111 (BOE); General Regulation, articles 55 to 59 (BOE); Regulation of the Caja General de Depósitos, article 12 (BOE). Consulted on 7-11-2026. What the specifications of this tender say prevails.
Won it? Find subcontractors
If you win, part of the work can be subcontracted: local companies with similar work and, if the specifications reserve the contract, special employment centres and integration companies. See subcontractors
Minimum staff cost under the collective agreement
In services, staff cost sets the minimum price you can bid. Choose the collective agreement, enter its pay scale and check whether your bid covers it (art. 149.4 LCSP). Work out the staff cost
Your deadlines in working days
Counted using the calendar of the authority's seat: Madrid (Comunidad de Madrid) (Law 39/2015, art. 30).
- If they ask you for the documents (art. 150.2)
- If the request reaches you today, 22/11/2026: 10 working days from the day after Sunday 22 November 2026. Expires on Friday 4 December 2026. There is no public holiday within the period: only Saturdays and Sundays are skipped.
Excluding Saturdays, Sundays and national public holidays. Public holidays of Comunidad de Madrid are also deducted. Local holidays of Madrid are deducted. Any day that the Administration's calendar of non-working days adds (art. 30.6 and 30.7 of Law 39/2015) also extends the period.
Datos de festivos.io — CC BY 4.0 — https://festivos.io. Códigos postales: GeoNames — CC BY 4.0 — https://www.geonames.org.Count another deadline with your calendar (API: since, dias, cp_organo, cp_interesado).
If you are excluded or disagree
If something in the notice or the specifications prevents you from bidding, or if the committee leaves out your bid, you can go for free before a specialised tribunal: the special appeal on procurement, which is voluntary (art. 44.7).
- What you can appeal
- The tender notice, the specifications and the contract documents.
- Procedural acts that decide on the award, prevent continuing or leave a party defenceless; in any case, the admission or rejection of candidates and bidders and the admission or exclusion of bids, including those excluded as abnormally low (art. 149).
- The award decision.
- Certain contract modifications (arts. 204 and 205), assignments to in-house bodies and concession buy-backs.
- Before which tribunal
- It depends on the administration the contracting authority belongs to: the TACRC if it is a State one (art. 45) and the region's tribunal if it is regional or local (art. 46). See the table of tribunals. Source: LCSP, art. 46: órgano competente en las comunidades autónomas y entidades locales (consolidated text, accessed on 7 November 2026).
- Deadline
- 15 working days (art. 50.1). They are counted from the day after: the publication of the notice, for the notice and for the specifications (if the notice says how to access them); the day you learned of the act, for procedural acts such as an exclusion; the notification of the award. If you want to appeal the specifications, do so before submitting your bid (art. 50.1.b). The period keeps running while you ask to see the file (art. 52.2). Appealing the award suspends the procedure (art. 53). The appeal can be filed at the contracting authority's registry or at the tribunal's (art. 51.3).Source: LCSP, art. 50: iniciación del procedimiento y plazo (consolidated text, accessed on 7 November 2026).
- Applicable case law
- What is appealed and how long it takes. In 2025 the TACRC received 2.226 appeals (in 2024, 1.824). The award was appealed in 43,58 % of cases, the specifications in 25,18 % and the exclusion in 19,99 %. 15,85 % of appeals were upheld in full and 6,59 % in part; 46,95 % were dismissed and 30,64 % ended without a ruling on the merits. The average time to decide was 55 calendar days (in 2024, 46), counted from when the Tribunal has the file. Source: Memoria 2025 del Tribunal Administrativo Central de Recursos Contractuales (financial year 2025, pp. 14 and 17).
- OIReScon. The 2025 annual supervision report asks for attention to exclusions for bids deemed abnormal and to formal grounds for exclusion. Source: Informe anual de supervisión 2025 de la OIReScon: conclusiones y recomendaciones (approved on 22 December 2025). Source: Buscador de informes consultivos (OIReScon) (accessed on 7 November 2026).
- Junta Consultiva de Contratación Pública del Estado. Before leaving you out for a defect in the documents of the request (art. 150.2), they must give you a chance to correct it if it is not an absolute breach and the requirement already existed when the deadline expired. Source: Junta Consultiva de Contratación Pública del Estado, expediente 6/2021 (art. 150.2 LCSP) (file 6/2021). Source: Informes de la Junta Consultiva de Contratación Pública del Estado (accessed on 7 November 2026).
- Rulings and judgments. Search the TACRC decisions, case law on the CENDOJ. Where to look for those of your region's tribunal.
Everything about the special appeal · Review your bid before submitting it
| Contracting authority | Rectorado de la Universidad Complutense de Madrid |
|---|---|
| Case reference | V-SD/2025/000365 |
| Type of contract | Services |
| Procedure | Restricted |
| Régimen | Ley de Contratos del Sector Público; Regulación armonizada |
| Base budget excluding VAT | 3.740.000,00 € |
| Base budget including VAT | 4.525.400,00 € |
| Estimated value | 3.740.000,00 € |
| Place of performance | Madrid |
| CPV | 71200000 · Servicios de arquitectura y servicios conexos; 71328000 · Servicios de verificación de la estructura; 71317210 · Servicios de consultoría en salud y seguridad; 71317000 · Servicios de consultoría en protección y control de riesgos; 71730000 · Servicios de inspección industrial; 71310000 · Servicios de consultoría en ingeniería y construcción |
| End of the submission period | 04/02/2030 at 18:00 (1170 days left) |
| Status | Open for bids |
Régimen de esta licitación
- Ley de Contratos del Sector Público Ley 9/2017, de Contratos del Sector Público (LCSP)
Contrato regido por la Ley 9/2017. - Regulación armonizada Art. 19 de la Ley 9/2017
Supera el umbral europeo: el anuncio también sale en el Diario Oficial de la UE, y el DEUC y los plazos mínimos son los de la UE.
Origen de los datos: Ministerio de Hacienda (Plataforma de Contratación del Sector Público). Actualizado el 11/11/2026 a las 11:59. No somos una plataforma de contratación: la oferta se presenta en la del órgano.