Skip to content
AIM PAPYRSign inMenu
Tenders · Pontevedra

5780/2026 Licitación para contratar la obra de mejora de la impermeabilización y renovación de la Plaza Él Sol de O Porriño

Trabajos de pavimentación de calles · Works contract · Pontevedra · 1 lot

Submission deadline26 days leftuntil 14/12/2026 at 13:00
Base budget excluding VAT500.654,03 €estimated value 484.103,50 €
Contracting authorityConcello de O PorriñoProcedure: Open

Are you going to bid? We email you if the deadline or the specifications change, a new document comes out, or it is cancelled or awarded.

Prepare my bid

Should I bid?

To bid you need…

What an experienced bidder checks before preparing a bid, with the data behind each point. The decision is yours.

Lots

Prepare my bid

  1. Find
  2. Decide
  3. Prepare
  4. Submit
  5. After winning

The steps, in the order you do them. You submit on the contracting body's platform, not here.

  1. Decide whether to bid Should I bid?
  2. Read what they ask for Compliance matrix
  3. Review your bid Review my bid
  4. Submit it Submit on each platform · Add the deadline to my calendar

How much winners bid below

En 13 contratos de este órgano en el mismo sector (obras), quien ganó bajó una mediana del 3,1 % (half of them between 0,0 % and 8,6 %). With three or more bids, 4,8 %. Only one bid was submitted in 30 % of them. Work out the abnormally low bid threshold.

Documents and notices

What Concello de O Porriño buys and who it awards to · More tenders in Pontevedra · More tenders: works

Guarantees, payments, appeals and all the data in the notice

Guarantees

Final guarantee: 5 % of the price you bid, excluding VAT (what the law sets; the specifications may exempt it). If you bid the base budget, 25.032,70 €; with your reduction, less. It is provided by the bidder with the best offer, before the award.

How it is provided

  • Bank guarantee from a bank, savings bank, credit cooperative, financial credit institution or mutual guarantee society: joint and several, waiving the benefit of discussion, payable on first demand and with no end date.
  • Surety bond with an insurer authorised in that line.
  • Cash or Public Debt securities, at the Caja General de Depósitos (state deposit office) or at the deposit office of the contracting region or local entity.
  • Withholding from the price, only if the specifications provide for it.

The final guarantee, as a bank guarantee or surety bond, is deposited at the Caja General de Depósitos or the equivalent deposit office of the contracting administration; the provisional one, as a bank guarantee or surety bond, is handed to the contracting authority.

Check who is vouching for you

Before paying the fee, check that the entity is registered: Bank of Spain register of entities (banks and mutual guarantee societies) or register of insurers of the Directorate-General for Insurance (surety bonds).

Public Sector Contracts Act, articles 106 to 111 (BOE); General Regulation, articles 55 to 59 (BOE); Regulation of the Caja General de Depósitos, article 12 (BOE). Consulted on 7-11-2026. What the specifications of this tender say prevails.

How long it takes to pay

O Porriño Town Council paid its suppliers in 44,1 days on average (abril–junio de 2026). That is above the 30 days the law sets: expect to be paid later, and factor the late-payment interest into your bid.

Source of the data: Ministerio de Hacienda, average supplier payment period (RD 635/2014), consulted on 11-11-2026. When you have to be paid and what to do if you are not.

Won it? Find subcontractors

If you win, part of the work can be subcontracted: local companies with similar work and, if the specifications reserve the contract, special employment centres and integration companies. See subcontractors

Your deadlines in working days

Counted using the calendar of the authority's seat (Law 39/2015, art. 30).

If they ask you for the documents (art. 150.2)
If the request reaches you today, 18/11/2026: 10 working days from the day after Wednesday 18 November 2026. Expires on Wednesday 2 December 2026. There is no public holiday within the period: only Saturdays and Sundays are skipped.

Only national public holidays are deducted: each regional or local holiday at the authority's location extends the deadline by one day. Enter the authority's region (or its postcode) and we deduct them. Any day that the Administration's calendar of non-working days adds (art. 30.6 and 30.7 of Law 39/2015) also extends the period.

Count another deadline with your calendar (API: since, dias, cp_organo, cp_interesado).

If you are excluded or disagree

This contract is below 3.000.000 € of estimated value: it is not subject to the special appeal. Its acts are appealed under Law 39/2015 and Law 29/1998 on the contentious-administrative jurisdiction (art. 44.6). Before submitting, review your bid so that there is nothing to appeal. Source: LCSP, art. 44: recurso especial en materia de contratación, actos recurribles (consolidated text, accessed on 7 November 2026).

Contracting authorityConcello de O Porriño
Case referencePcPG/2026/829605
Type of contractWorks
ProcedureOpen
Base budget excluding VAT500.654,03 €
Estimated value484.103,50 €
Place of performancePontevedra
CPV45233252 · Trabajos de pavimentación de calles; 45261420 · Trabajos de impermeabilización
End of the submission period14/12/2026 at 13:00 (26 days left)
StatusOpen for bids

Origen de los datos: Ministerio de Hacienda (Plataforma de Contratación del Sector Público). Actualizado el 17/11/2026 a las 14:11. No somos una plataforma de contratación: la oferta se presenta en la del órgano.