Skip to content
AIM PAPYRSign inMenu

Simulated evaluator

Before submitting it, look at your proposal through the committee's eyes: the points it would give in each value-judgement criterion, what the specifications say is assessed, what your proposal does well and what it lacks, each with its page.

How closely it matches the committee. In 40 lots of real evaluation reports, for each pair of bids that the committee scored differently, the evaluator ranks them the same way in 78.1 % of cases (by chance it would be 50 %), and its best bid is the committee's in 23 of 40. In points it deviates on average by 14.2 % of the maximum. Use it to see what your proposal lacks, not as the score you will get. How we measure it.

Contrato mixto de Suministro e instalación de césped artificial y desmontaje del existente para la renovación del campo municipal de futbol Jesús Fraile de Talavera de la Reina
Junta de Gobierno del Ayuntamiento de Talavera de la Reina · expediente 101/2026/CON
Leemos su pliego para saber qué valora cada criterio.
Los criterios de juicio de valor

Los del anuncio. Corrígelos si el pliego los desglosa (por ejemplo, «Metodología» hasta 10 y «Equipo» hasta 5).

Tu memoria técnica

PDF o Word, como la vas a presentar (hasta 3 archivos). No la guardamos: se lee para valorarla y se olvida, y la lee un modelo alojado en la Unión Europea.

Es una simulación, no la valoración de la mesa ni asesoramiento jurídico.

Next step

Review my bid Back to the tender's page