Simulated evaluator
Before submitting it, look at your proposal through the committee's eyes: the points it would give in each value-judgement criterion, what the specifications say is assessed, what your proposal does well and what it lacks, each with its page.
How closely it matches the committee. In 40 lots of real evaluation reports, for each pair of bids that the committee scored differently, the evaluator ranks them the same way in 78.1 % of cases (by chance it would be 50 %), and its best bid is the committee's in 23 of 40. In points it deviates on average by 14.2 % of the maximum. Use it to see what your proposal lacks, not as the score you will get. How we measure it.
Contrato de del servicio de redacción del proyecto y Estudio de Seguridad y Salud para Aula de formación "Atunara" en La Línea de la Concepción
Alcaldía del Ayuntamiento de la Línea de la Concepción · expediente 110/26
Leemos su pliego para saber qué valora cada criterio.
Alcaldía del Ayuntamiento de la Línea de la Concepción · expediente 110/26
Leemos su pliego para saber qué valora cada criterio.